Difference between revisions of "2n BKG data"

From New IAC Wiki
Jump to navigation Jump to search
Line 9: Line 9:
 
Detector G: HV(G1) = -1700 V, HV(G2) = -1650 V.
 
Detector G: HV(G1) = -1700 V, HV(G2) = -1650 V.
  
There was 2" of lead in front of the Det G. Det G was on the floor.
+
There was 2" of lead in front of the Det G. Det G was placed on the floor.
  
 
Case A: Target out, radiator in - Counting rate (G1) = 1/168 (gammas/pulse)
 
Case A: Target out, radiator in - Counting rate (G1) = 1/168 (gammas/pulse)
  
 
Case B: Target out, radiator in, downstream collimator blocked - Counting rate (G1) = 1/485 (gammas/pulse)
 
Case B: Target out, radiator in, downstream collimator blocked - Counting rate (G1) = 1/485 (gammas/pulse)

Revision as of 21:32, 7 December 2012

[math]I_{e^-} = 30 mA[/math], [math]Pw=20 ns[/math], [math]R=300Hz[/math], [math]E_{e^-}=10.5 MeV[/math]

Upstream collimator diamater = 0.25"

Downstream collimator diamater = 2.0"

2 Al sheets as bremsstrahlung radiator;

Detector G: HV(G1) = -1700 V, HV(G2) = -1650 V.

There was 2" of lead in front of the Det G. Det G was placed on the floor.

Case A: Target out, radiator in - Counting rate (G1) = 1/168 (gammas/pulse)

Case B: Target out, radiator in, downstream collimator blocked - Counting rate (G1) = 1/485 (gammas/pulse)