Difference between revisions of "Beam Test Jul 23 2012"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
= DAQ runs = | = DAQ runs = | ||
− | Beam Left -> CH6 | + | Detector2 -> Beam Left -> CH6 |
− | Beam Right -> CH5 | + | Detector3 -> Beam Right -> CH5 |
Run# Reprate T1 T2 Start Time Stop Time Int Rate(Events/S) | Run# Reprate T1 T2 Start Time Stop Time Int Rate(Events/S) |
Revision as of 16:34, 23 July 2012
Tune
Tune it to Chad's tune from last run: Beam_Test_Jul_20_2012#Chad.27s_Tune
Tune and deliver positrons
Tune it to Chad's tune from last run: Beam_Test_Jul_20_2012#Chad.27s_Tune
Positrons observed on the 90 degree scintilator.
DAQ runs
Detector2 -> Beam Left -> CH6
Detector3 -> Beam Right -> CH5
Run# Reprate T1 T2 Start Time Stop Time Int Rate(Events/S) 3636 8 Hz in in 09:49:49 10:03:39 2.4334 3637 8 Hz in in 10:04:08 10:20:16 2.1641 3638 8 Hz in in 10:24:05 10:27:45 2.51