Difference between revisions of "2012AnnihCountrRateEstimate"

From New IAC Wiki
Jump to navigation Jump to search
Line 15: Line 15:
 
| Condition || Grade Calculation
 
| Condition || Grade Calculation
 
|-
 
|-
| If all Homework is complete and Simulation project is turned in on time || (50%) Homework + (50%)(Simulation Project)
+
| Electron Beam Energy || 10 MeV
 
|-
 
|-
| If 1 homework set is incomplete or more than 48 hours late || (60%)Homework + (40%)(Simulation Project)
+
| Peak current || 40 mA
 
|-
 
|-
|Otherwise ||(70%)Homework + (30%)(Simulation Project)
+
| Pulse width || 10 MeV
 +
|-
 +
| Electron Beam Energy || 10 MeV
 
|-
 
|-
 
|}
 
|}

Revision as of 17:37, 19 January 2012

Rate Estimates

Previous experiment at the IAC

052008PosProdApparatus.png 052008PosProdSignal.png 052008PosProdBackgrd.png
IAC apparatus for positron production experiment Counts observed when the dipole is tuned to direct positrons onto the Ta target Counts from electrons on Ta target
HpGe observed about 1 annihilation photon per 10 microCoulombs of electrons on the upstream Tungsten target
Ratio of annihilation photons observed when using positrons to electrons 120 to 10
Condition Grade Calculation
Electron Beam Energy 10 MeV
Peak current 40 mA
Pulse width 10 MeV
Electron Beam Energy 10 MeV

NaI rate Ratio of positron to electron beam

Assumed Geometry

Assume a 2 mm thick Tungsten target that is 1" square

The target is located at -80 < Z < -80.2

The NaI crystal is 2.32" or 56.49 mm in diameter

The NaI crystal is 8" from the target then the opening angle is atan(2.32/8/2) = 8.25 degrees


PePPO_2012Run