Line 4: Line 4:
 
Positrons may be In May
 
Positrons may be In May
  
The main electron beam current needs to be limited to  10 nA.  
+
The main electron beam current needs to be limited to  10 nA using a beam line cavity.
  
 
Currently max energy is 7.8 MeV.
 
Currently max energy is 7.8 MeV.

Revision as of 16:11, 23 November 2011

Run Configuration

Positrons may be In May

The main electron beam current needs to be limited to 10 nA using a beam line cavity.

Currently max energy is 7.8 MeV.

Choosing 6.3 MeV incident electron energy because that is the most stable.

[math]\sigma[/math] = 0.5 mm on the Tungsten target (T1)

Date Task/Item
Jan 22, 2012 Readiness Review


Positrons