Difference between revisions of "PePPO 2011Run"
Jump to navigation
Jump to search
Line 24: | Line 24: | ||
|- | |- | ||
|October 2011 || Finish Work in Injector area for PePPO | |October 2011 || Finish Work in Injector area for PePPO | ||
− | |||
− | |||
|- | |- | ||
|October 17-19, 2011 || Swing shift hot checkout | |October 17-19, 2011 || Swing shift hot checkout |
Revision as of 14:54, 7 September 2011
PePPO run
Currently scheduled Injector recovery on October 22
Positrons May be November 4 & 5
Currently max energy is 7.8 MeV.
Choosing 6.3 MeV incident electron energy because that is the most stable.
= 0.5 mm on the Tungsten target (T1)
June | Racks installed and cables pulled to tunnel |
August 2011 | vacuum pumps ready, Compton Polarimeter Table installed |
September 2011 | Beam Line installed |
October 2011 | Finish Work in Injector area for PePPO |
October 17-19, 2011 | Swing shift hot checkout |
October 29-Nov 1 2011 | Owl shift PePPo tuning |
Nov 3-6 2011 | Day shift PePPo running |
Region 3
Cable length are 75-100 feet long
2 NaI detectors
one has mirror between it and the port window to reflect light to a camera.
See if we can send out one of our actuators to move the mirror in and out.