Difference between revisions of "Beamline Drawing 2011 J.Ellis"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
|Q4 || Fourth Quad ||1.400 m || | |Q4 || Fourth Quad ||1.400 m || | ||
|- | |- | ||
− | |Q5|| Fifth Quad || 1.650 m || | + | |Q5|| Fifth Quad || 1.650 m || |
|- | |- | ||
|Q6 || Sixth Quad || 1.8 || | |Q6 || Sixth Quad || 1.8 || | ||
Line 32: | Line 32: | ||
|FC1 || Faraday Cup 1 || || | |FC1 || Faraday Cup 1 || || | ||
|- | |- | ||
− | |D1 || First Kiwi Dipole || 2.525 m || | + | |D1 || First Kiwi Dipole || 2.525 m || |
|- | |- | ||
− | | | + | |S1 || Energy Slits || 2.851 m || |
|- | |- | ||
|STXY4|| X-Y steerers 4 || || | |STXY4|| X-Y steerers 4 || || |
Revision as of 15:24, 24 March 2011
Below is the Beamline sketch
Label | Beam Line Element | Z location from Gate Valve | Dimensions of Element |
G1 | Fast Gate Valve | 0.000 m | |
STXY1 | X-Y steerers 1 | ||
Q1 | First Quad | 0.175 m | |
Q2 | Second Quad | 0.425 m | |
Q3 | Third Quad | 0.675 m | |
STXY2 | X-Y steerers 2 | ||
Targ1 | positron production target | 1.175 m | |
Q4 | Fourth Quad | 1.400 m | |
Q5 | Fifth Quad | 1.650 m | |
Q6 | Sixth Quad | 1.8 | |
STXY3 | X-Y steerers 3 | ||
F1 | OTR Flag | ||
FC1 | Faraday Cup 1 | ||
D1 | First Kiwi Dipole | 2.525 m | |
S1 | Energy Slits | 2.851 m | |
STXY4 | X-Y steerers 4 | ||
Q7 | Seventh Quad | 3.026 m | |
F1 | Yag SCREEN | 3.296 m | |
D2 | Second Kiwi Dipole | 3.617 m | |
Q8 | Eigth Quad | 4.063 m | |
STXY5 | X-Y steerers 5 | ||
Q9 | Quad | 4.603 m | |
Q10 | Quad | 5.143 m | |
F3 | Third Flag | 5.712 m | |
Targ2 | Brehm target ladder | 6.112 m | |
HOLE@WALL | 6.412 m |