Difference between revisions of "HRRL Move 2010"

From New IAC Wiki
Jump to navigation Jump to search
Line 4: Line 4:
 
|Start Date || Finish Date  || Task
 
|Start Date || Finish Date  || Task
 
|-
 
|-
| 10/1/10 || 11/1/10 || Move the HRRL and construct new beamline
+
| 10/01/10 || 11/01/10 || Move the HRRL and construct new beamline
 
|-
 
|-
| 11/1/10 || 11/15/10  ||    Measure Radiation Field and Prepare for Hunt Run
+
| 11/01/10 || 11/15/10  ||    Measure Radiation Field and Prepare for Hunt Run
 
|-
 
|-
 
| 11/15/10    || 12/17/10  ||  Hunt Beam Time (3 MeV, 300 Hz, multiple pulsing)
 
| 11/15/10    || 12/17/10  ||  Hunt Beam Time (3 MeV, 300 Hz, multiple pulsing)
 
|-
 
|-
| 1/3/10 || 1/14/10 ||  Prepare for high current emmittance measurements
+
| 01/03/10 || 01/14/10 ||  Prepare for high current emmittance measurements
 
|-
 
|-
| 1/18/10 || 1/21/10 ||  high current emmittance measurements (10 MeV, 50 ns pulse width, variable rep rate and current)
+
| 01/18/10 || 01/21/10 ||  high current emmittance measurements (10 MeV, 50 ns pulse width, variable rep rate and current)
 
|-
 
|-
 
|}
 
|}

Revision as of 14:56, 2 September 2010

Timeline

Start Date Finish Date Task
10/01/10 11/01/10 Move the HRRL and construct new beamline
11/01/10 11/15/10 Measure Radiation Field and Prepare for Hunt Run
11/15/10 12/17/10 Hunt Beam Time (3 MeV, 300 Hz, multiple pulsing)
01/03/10 01/14/10 Prepare for high current emmittance measurements
01/18/10 01/21/10 high current emmittance measurements (10 MeV, 50 ns pulse width, variable rep rate and current)

Tasks

1.) Alignment: a.) spare gun b.) laser with targets mounted on wall.


Design preference

Thin aluminum target for OTR right after 3 quads place at exit to Linac