Difference between revisions of "Finding the Space Between Lead Shots"

From New IAC Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
==Plan 1==
 
==Plan 1==
 
By Mass
 
By Mass
[[Image:lead shot.jpg|thumb|Lead Shot|400 px]]
+
[[Image:lead shot labeled.jpg|thumb|Lead Shot|400 px]]
 
1 - Empty box, m <sub>1</sub>
 
1 - Empty box, m <sub>1</sub>
  

Revision as of 12:17, 15 July 2008

Plan 1

By Mass

Lead Shot

1 - Empty box, m 1

2 - Box filled with Lead, m 2

3 - Box filled with Lead and H 2 0, m 3

4 - Box filled with H 2 0, m 4


m Pb = m 2 - m 1

V Pb = (m 2 - m 1) / ρ Pb


m H 2 0 = m 3 - m 2

V H 2 0 = (m 3 - m 2) / ρ Pb = V SP (The space between the lead)

ratio = V Pb / V tot


Plan 2

By Volume

1 - V H 2 0 1 = V tot

2 - V H 2 0 2 = V SP


V Pb = V tot - V SP

R = V Pb / V tot = (V tot - V SP) / V tot => 1 - (V SP / V tot)