Difference between revisions of "Finding the Space Between Lead Shots"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
==Plan 1== | ==Plan 1== | ||
By Mass | By Mass | ||
− | + | [[Image:lead shot.jpg|thumb|Lead Shot|400 px]] | |
1 - Empty box, m <sub>1</sub> | 1 - Empty box, m <sub>1</sub> | ||
Line 22: | Line 22: | ||
ratio = V <sub>Pb</sub> / V <sub>tot</sub> | ratio = V <sub>Pb</sub> / V <sub>tot</sub> | ||
− | |||
==Plan 2== | ==Plan 2== |
Revision as of 12:14, 15 July 2008
Plan 1
By Mass
1 - Empty box, m 1
2 - Box filled with Lead, m 2
3 - Box filled with Lead and H 2 0, m 3
4 - Box filled with H 2 0, m 4
m Pb = m 2 - m 1
V Pb = (m 2 - m 1) / ρ Pb
m H 2 0 = m 3 - m 2
V H 2 0 = (m 3 - m 2) / ρ Pb = V SP (The space between the lead)
ratio = V Pb / V tot
Plan 2
By Volume
1 - V H 2 0 1 = V tot
2 - V H 2 0 2 = V SP
V Pb = V tot - V SP
R = V Pb / V tot = (V tot - V SP) / V tot => 1 - (V SP / V tot)