Difference between revisions of "Finding the Space Between Lead Shots"

From New IAC Wiki
Jump to navigation Jump to search
Line 22: Line 22:
 
ratio = V <sub>Pb</sub> / V <sub>tot</sub>
 
ratio = V <sub>Pb</sub> / V <sub>tot</sub>
  
 
+
[[Image:lead shot.jpg|thumb|Lead Shot|300 px]]
  
 
==Plan 2==
 
==Plan 2==

Revision as of 12:14, 15 July 2008

Plan 1

By Mass

1 - Empty box, m 1

2 - Box filled with Lead, m 2

3 - Box filled with Lead and H 2 0, m 3

4 - Box filled with H 2 0, m 4


m Pb = m 2 - m 1

V Pb = (m 2 - m 1) / ρ Pb


m H 2 0 = m 3 - m 2

V H 2 0 = (m 3 - m 2) / ρ Pb = V SP (The space between the lead)

ratio = V Pb / V tot

Lead Shot

Plan 2

By Volume

1 - V H 2 0 1 = V tot

2 - V H 2 0 2 = V SP


V Pb = V tot - V SP

R = V Pb / V tot = (V tot - V SP) / V tot => 1 - (V SP / V tot)