* Vacuum pipe and radiator ladder (design)
 
* Vacuum pipe and radiator ladder (design)
[[Image:ndetector.jpg|thumb|300 px]]
+
[[Image:ndetector.jpg|thumb|Data Acquisition Electronics|300 px]]
  
 
* Graphite block with Pb sheet (design /  fabrication)
 
* Graphite block with Pb sheet (design /  fabrication)

Revision as of 14:04, 3 July 2008

  • Vacuum pipe and radiator ladder (design)
Data Acquisition Electronics
  • Graphite block with Pb sheet (design / fabrication)
  • Pb collimator (design / fabrication)
  • d20 target
  • d20 target mount
  • Get no detectors; high voltage (check them out)
  • no detector mount / shielding (design / fabrication)
  • Data acquisition electronics
    • Discriminators
    • Scalers
    • Take the digital pulse, send it into a counter (scaler), and it gives us a number.
  • Callibration procedure
  • Beam position monitoring