Difference between revisions of "Things That Still Need to Get Done"

From New IAC Wiki
Jump to navigation Jump to search
 
Line 1: Line 1:
=Things That Still Need to Get Done=
 
 
 
• Vacuum pipe and radiator ladder (design)
 
• Vacuum pipe and radiator ladder (design)
  

Revision as of 16:55, 2 July 2008

• Vacuum pipe and radiator ladder (design)

• Graphite block with Pb sheet (design / fabrication)

• Pb collimator (design / fabrication)

• d20 target

• d20 target mount

• Get no detectors; high voltage (check them out)

• no detector mount / shielding (design / fabrication)

• Data acquisition electronics

  • Discriminators
  • Scalers
  • Take the digital pulse, send it into a counter (scaler), and it gives us a number.

• Callibration procedure

• Beam position monitoring