Ftof p1a:Integrated Digitized Bank: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Vanwdani (talk | contribs)
No edit summary
Vanwdani (talk | contribs)
No edit summary
Line 54: Line 54:




[[File:ftof.png | thumb | center | ftof | 400px | Figure 1: View of the FTOF counters for CLAS12 highlighting the location of the panel-1
[[File:ftof.png | thumb | center | ftof | 600px | Figure 1: View of the FTOF counters for CLAS12 highlighting the location of the panel-1
and panel-2 counters. The panel-1b counter arrays are shown in orange and the panel-2
and panel-2 counters. The panel-1b counter arrays are shown in orange and the panel-2
counter arrays, mounted around the perimeter of the Forward Carriage, are shown in red.
counter arrays, mounted around the perimeter of the Forward Carriage, are shown in red.
The panel-1a counter arrays mounted just downstream of the panel-1b arrays are not visible
The panel-1a counter arrays mounted just downstream of the panel-1b arrays are not visible
in this picture. The Forward Carriage is roughly 10 m in diameter.]]
in this picture. The Forward Carriage is roughly 10 m in diameter.]]

Revision as of 15:11, 22 July 2016

Caption
SubBank Number Variable Description
1 sector
2 paddle
3 ADCL
4 ADCR
5 TDCL
6 TDCR
7 ADCLu
8 ADCRu
9 TDCLu
10 TDCRu
99 hitn

Geometry Description (CLAS12 NOTE 2016-?)


Figure 1: View of the FTOF counters for CLAS12 highlighting the location of the panel-1 and panel-2 counters. The panel-1b counter arrays are shown in orange and the panel-2 counter arrays, mounted around the perimeter of the Forward Carriage, are shown in red. The panel-1a counter arrays mounted just downstream of the panel-1b arrays are not visible in this picture. The Forward Carriage is roughly 10 m in diameter.