Line 20: | Line 20: | ||
Manufacturer: EZ sockets, Springfield N.J. 07081 | Manufacturer: EZ sockets, Springfield N.J. 07081 | ||
+ | |||
+ | We are also short on nylon stand-offs that are the mounts for the HVTB's. | ||
+ | |||
+ | |||
+ | Total needed: 56 | ||
+ | |||
+ | Current inventory: 31 | ||
+ | |||
+ | Need: 25 get 30 to have some spares | ||
+ | |||
+ | Stand-off type: male-female threaded hex 1/4" hex, 3/8" length, 8-32 thread (according to our specification diagram) | ||
+ | |||
+ | =2/21/14= | ||
+ | |||
+ | |||
+ | Work on packing equipment for shipping | ||
+ | |||
+ | need brass screws to arrive in order to finish windows. | ||
+ | |||
+ | need nylon standoffs to finish gluing everything in place before remove from the clean room. | ||
+ | |||
+ | Need 4 more pallets, 2 for each lift and at least 1 for the A-frames probably 2. | ||
+ | |||
+ | Current Plan: | ||
+ | |||
+ | 1.) Move A-Frames and lifts to shipping area week before spring break | ||
+ | |||
+ | 2.) move chambers to loading dock on Monday of spring break. | ||
+ | |||
+ | 3.) move pallets with equipment out elevator and to loading doc after chambers are on loading dock. | ||
+ | |||
+ | |||
+ | |||
+ | [[CLAS12_R1_Progress_Reports]] |
Latest revision as of 16:21, 21 February 2014
2/8/14
We are ready to install the mylar windows (windows have been cut), however we are short on screws.
Screws required:
Upstream window - 49 screws
Downstream window - 55 screws
Total needed: 104 screws
Current inventory: 36
Need: 68 screws (they come in packs of 10 = 7 packs)
Screw type: Socket head cap screw 8-32 x 1/2 brass
Manufacturer: EZ sockets, Springfield N.J. 07081
We are also short on nylon stand-offs that are the mounts for the HVTB's.
Total needed: 56
Current inventory: 31
Need: 25 get 30 to have some spares
Stand-off type: male-female threaded hex 1/4" hex, 3/8" length, 8-32 thread (according to our specification diagram)
2/21/14
Work on packing equipment for shipping
need brass screws to arrive in order to finish windows.
need nylon standoffs to finish gluing everything in place before remove from the clean room.
Need 4 more pallets, 2 for each lift and at least 1 for the A-frames probably 2.
Current Plan:
1.) Move A-Frames and lifts to shipping area week before spring break
2.) move chambers to loading dock on Monday of spring break.
3.) move pallets with equipment out elevator and to loading doc after chambers are on loading dock.