Difference between revisions of "GEM performance data graphs"

From New IAC Wiki
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
  
  
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|5593 || on || 15:55:04 || 16:29:20 || stable beam to the end of the run.
 
  
|-
 
|5594 || on || 16:36:19 || 17:03:52 || stable beam to the end of the run.
 
|-
 
|5595 || on || 08:28:09 || 08:45:19 || stable beam to the end of the run.
 
|-
 
|5596 || on || 08:47:16 || 10:06:37 || stable beam to the end of the run.
 
|-
 
|5603 || on but trasfered || 13:31:30 || 14:38:02 || shutter is close
 
|}
 
 
;Wednesday 08/21-22/13
 
 
- Detector voltage is 2300, 2800V GEM and Cathode successively. GEM has not any output to the TDC for 5773, 5774.
 
 
 
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|5773 || on  || ||  || beam on for 4-10s, overflow
 
|-
 
|5774 || on  || ||  || beam on for 4-10s shutter is close, beam energy is 7.5 MeV
 
|-
 
|5775 || on  || ||  || beam on for 4-10s shutter is open,  beam energy is 7.5 MeV
 
|-
 
|5776 || on  || ||  || beam on for 4-10s shutter is open,  beam energy is 7.5 MeV
 
|-
 
|5777 || on  || ||  || beam on for 4-10s shutter is close, beam energy is 7.5 MeV
 
|-
 
|5778 || off  || 19:54:17|| 6:00:00  || shutter is close 2.8, 3.4 G/C, Amp.6_6
 
|-
 
|5779 || off  || 6:05:33||  || shutter is open 2.8, 3.4 G/C, Amp.6_6
 
|-
 
 
|}
 
 
===09/23/13 BeamOn shutter close2.8_3.4kV===
 
 
ADC : GEM CH#5, Scintillator 11
 
 
TDC: GEM CH#27,31 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6087 || on  || 11:58:23 ||12:56:30|| , ADC does not collect charge from the scintillator 3.4,2.8kV
 
|-
 
|6088 || on  || 12:56:58 |||| beam on, 3.4,2.8kV
 
|-
 
|6089 || on  || 13:41:15 ||14:19:01|| , 2.8,2.8kV, run included a beam off then beam on again.
 
|-
 
|6090 || on  || 14:31:39 ||14:34:45 ||  3.4,2.8kV
 
|-
 
|6091 || on  || 14:36:29 || 15:20:07|| 43' 38" 3.4,2.8kV
 
|-
 
|6092 || on  || 15:22:16 ||15:41:36 ||  19' 20"  3.4,2.8kV
 
|-
 
|6093 || on  || 15:42:46 || 16:27:24 || 44 38" 3.4,2.8kV
 
|-
 
|6094 || on  || 16:28:28 || 16:58:48||  30' 20"  3.4,2.8kV, high sci. voltage that saturate the ADC, b
 
|-
 
 
|}
 
 
===09/24/13 BeamOn shutter open 2.8_3.4kV===
 
 
ADC : GEM CH#5, Scintillator 11
 
 
TDC: GEM CH#27,31 (just 31 gives time hits but it is a kind of weird!!!!!), Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6095 || on  ||  09:49:48 ||10:35:32 || beam turned off twice for a short time
 
|-
 
|6096 || on  ||  10:36:06 || 13:41:58|| scin. ADC signal without Amplification
 
|-
 
|6097 || on  ||  13:42:41 || 16:49:59 ||
 
|-
 
|6098 || on  ||  16:50:11 || 17:08:43 ||
 
 
|}
 
 
===09/25/13 BeamOn shutter open 3.3,2.7kV===
 
 
ADC : GEM CH#5, Scintillator 9,11
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6100 || on  ||  08:17:48 ||08:31:49 ||sci. ampl. is changed for qdc.
 
|-
 
|6101 || on  ||  08:48:59 ||09:04:14 ||
 
|-
 
|6102 || on  ||  09:08:27 ||09:53:58 || sci. ADC ch#9
 
|-
 
|6103 || on  ||  09:55:21 ||10:05:19 || beam is off
 
|-
 
|6104 || on  ||  10:06:48 ||10:54:21||
 
|-
 
|6105 || on  ||  10:55:08 || 11:43:05||
 
|-
 
|6106 || on  ||  11:44:06|| 13:34:49||
 
|-
 
 
|6113 || on  ||  16:28:10|| 16:56:49|| spec. amp. 500
 
|-
 
 
|}
 
 
===09/25/13 BeamOn shutter open 2.6_3.2kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6107 || on  ||  13:37:21 || 13:51:33|| peak sensing at low channel number
 
|-
 
 
|6108 || on  ||  13:52:19 || 14:08:42|| spectroscopic amplifier 100->200 coarse amp.
 
|-
 
|6109 || on  ||  14:09:21 ||  14:55:48 || spectroscopic amplifier 200->500 coarse amp.
 
|-
 
 
|6110 || on  ||  14:56:39 ||  15:26:26 || spectroscopic amplifier 200->500 coarse amp.
 
|-
 
|6111 || on  ||  15:30:40 || 15:56:29|| spectroscopic amplifier 200->500 coarse amp.
 
|-
 
|6112 || on  ||  15:57:18 || 16:25:24|| spectroscopic amplifier 200->500 coarse amp.
 
|-
 
 
 
|}
 
 
 
 
 
===09/26/13 BeamOn shutter close 2.7_3.3kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6118 || on  ||  07:27:40 || 07:41:06|| peak sensing at ch#100, but ADC still has two peaks.ch# 1374 and ch#1553! voltage of GEM = voltage of cathode = 2.7kV, osciloscope does not show any signal for GEM.
 
|-
 
|6122 || on  ||  08:22:59 || 09:01:28||
 
|-
 
|6123 || on  ||  09:03:21 || 09:44:26||
 
|-
 
|6124 || on  ||  09:51:51 || 10:22:48||
 
|-
 
|6125 || on  ||  10:26:06 || 10:59:21|| spec. amplif. changed 15-> 7.1 fine amp. 200 coarse overflow for Peak sensing
 
|-
 
|6126 || on  ||  11:02:13 || 11:15:37|| spec. amplif. changed 7.1-> 7.4
 
|-
 
|6127 || on  ||  11:17:04 || 11:51:21|| overflow for Peak sensing
 
|-
 
|6128 || on  ||  11:52:28 || 12:51:03|| overflow for Peak sensing
 
|-
 
|6129 || on  ||  12:52:02|| 13:14:32|| overflow for Peak sensing
 
 
 
 
 
|}
 
 
===09/26/13 BeamOn shutter close 2.6_3.2kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6133 || on  ||  13:21:00 || 13:24:49|| peak sensing at ch#100,
 
 
|-
 
|6134 || on  ||  13:26:23 || 13:30:20|| spec. amp 200->100
 
|-
 
|6136 || on  ||  13:33:18 || 13:43:14||9' 56" spec. amp 200->100 fine from 7.4 ->10
 
|-
 
|6138 || on  ||  13:47:19 || 13:57:10|| 10' 9"
 
|-
 
|6140 || on  ||  14:00:55 || 14:10:55||10' 
 
|-
 
|6147 || on  ||  15:10:12 || 15:22:20|| spec. amp fine 10->5
 
|-
 
|6148 || on  ||  15:23:16 || 15:38:57|| spec. amp fine  5->7.4
 
 
|-
 
|6149 || on  ||  15:40:40 || 15:51:23||
 
 
|-
 
|6151 || on  ||  15:53:13 || 16:04:06||
 
 
 
 
|}
 
 
===09/26/13 BeamOn shutter close 2.7_3.3kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6142 || on  ||  14:14:34 || 14:24:37|| 10' 3" differetnce between the peak of the two measurements is not enough to repeat using the new spc. amp new settings but the previous settings overflow the peak sensing!!!
 
|-
 
|6144 || on  ||  14:29:47 || 14:40:35|| 10' 48"
 
 
|-
 
|6145|| on  ||  14:44:10 || 14:55:24|| 11' 14"
 
|-
 
|6146|| on  ||  14:56:14 || 15:07:50|| 11' 36"
 
 
|}
 
 
===09/26/13 BeamOn shutter close 2.8_3.4kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6152 || on  ||  14:12:41 || 16:23:54|| 11' 13"
 
|-
 
|6153 || on  ||  16:24:45 || 16:34:37|| 10' 48"
 
|-
 
|6156 || on  ||  16:39:16 || 16:49:13|| 9' 57"
 
|-
 
|-
 
|6157 || on  ||  16:49:35|| 17:07:14|| 17'39"
 
 
|}
 
 
===09/27/13 BeamOn shutter open 2.8_3.4kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6159 || on  ||  08:38:06 || 08:47:59|| 9' 53"
 
|-
 
|6160 || on  ||  08:48:27 || 09:10:11||21 43"
 
|-
 
|6161 || on  ||  09:11:10|| 09:21:25||10' 15"
 
|-
 
|6162 || on  ||  09:23:23|| 09:33:18||
 
 
 
 
|}
 
 
 
===09/27/13 BeamOn shutter open 2.7_3.3kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6163 || on  ||  09:34:52 || 09:42:01||
 
|-
 
|6164 || on  ||  09:42:34 || 09:59:17||
 
|-
 
|6165 || on  ||  09:59:49 || 10:28:55||
 
|-
 
|6166 || on  ||  10:29:31 || 10:45:57||
 
 
 
|}
 
 
 
 
===09/27/13 BeamOn shutter open 2.6_3.2kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6167 || on  ||  10:47:49 || 11:00:06||
 
 
|-
 
|6168 || on  ||  11:00:46|| 11:13:33    ||
 
 
|-
 
|6169 || on  ||  11:14:31|| 11:24:36    ||
 
 
|-
 
|6170 || on  ||  11:25:15|| 11:29:34    ||
 
|-
 
|6171 || on  ||  11:30:22|| 11:41:52    ||
 
 
|}
 
 
 
===09/27/13 BeamOn shutter open 2.7_3.4kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6172 || on  ||  11:45:35 || 11:55:27||
 
|-
 
|6173 || on  ||  11:55:49 || 12:03:25||
 
 
|}
 
 
 
===09/27/13 BeamOn shutter open 2.7_3.2kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6174 || on  ||  12:04:42 || 12:13:11||
 
|-
 
|6175 || on  ||  12:13:30 || 12:22:40||
 
 
|}
 
 
===09/27/13 BeamOn shutter open 2.7_3.1kV===
 
 
ADC : GEM CH#5, Scintillator 9
 
 
TDC: GEM CH#27,31,28 , Scintillator 29
 
 
PS-ADC: GEM CH#15
 
 
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6176 || on  ||  12:24:58 || 12:50:30||
 
 
|}
 
 
 
 
 
===09/27/13 BeamOn shutter open 2.8_3.4kV===
 
 
 
TDC settings is changed for the scintillator.
 
 
{| border="1" cellpadding="4"
 
|-
 
|Run Number || Beam || Start Time || End time || Notes
 
|-
 
|6184 || on  ||  13:55:53 || 15:45:08||
 
 
|-
 
|6185 || on  ||  15:45:46 || 16:00:06||
 
|-
 
|6186 || on  ||  16:02:10 || 16:05:10|| <math> V_{cath} = V_{GEM} </math>
 
|-
 
|6187 || on  ||  16:06:26 || 16:19:15||
 
|-
 
|6188 || on  ||  16:20:26 || 17:14:21|| shutter is close, ended 4 min. after the beam is off <math> V_{cath} = V_{GEM} </math>
 
|}
 
 
===Analysis===
 
 
Main points:
 
 
#TDC settings, comon start, common stop mode.
 
# TDC range.
 
#changing the TDC settings. and source of TDC hits. (logic fold and dual timer and the effect of the delay)
 
# The difference in time scale between the oold and the new TDC settings (scintillator time)
 
#write a program for direct analysis of neutron spectrum based on TDC and QDC, and TDC and Peak sensing ADC.
 
#The best best GEM operating voltage as the beam is ON.
 
#difference between the TDC histograms in the two ntuple root files.
 
#
 
  
 
== IAC-Peak Sensing Measurements 09/01/13==
 
== IAC-Peak Sensing Measurements 09/01/13==
Line 463: Line 15:
  
 
[[IAC-QDC Measurements]]
 
[[IAC-QDC Measurements]]
 +
 +
 +
 +
GO BACK [https://wiki.iac.isu.edu/index.php/Neutron_TGEM_Detector_Abdel]

Latest revision as of 14:49, 2 October 2013

IAC runs as the electron beam in use

IAC runs as the electron beam in use



IAC-Peak Sensing Measurements 09/01/13

IAC-Peak Sensing Measurements


IAC-QDC Measurements 09/18/13

IAC-QDC Measurements


GO BACK [1]