Difference between revisions of "PePPO 2012Run"

From New IAC Wiki
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
Positrons may be In May
 
Positrons may be In May
  
The main electron beam current needs to be limited to  10 nA.  
+
The main electron beam current needs to be limited to  10 nA using a beam line cavity.
  
 
Currently max energy is 7.8 MeV.
 
Currently max energy is 7.8 MeV.
Line 16: Line 16:
 
|Date || Task/Item
 
|Date || Task/Item
 
|-
 
|-
|Jan 22, 2012  ||  Readiness Review
+
|Feb. 2, 2012  ||  Readiness Review
 +
|-
 +
|May , 2012  ||  Readiness Review
 +
|-
 +
|}
 +
 
 +
=Manpower=
 +
 
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
|Collaborator || available
 +
|-
 +
|Phil Cole  ||  1 week (not available July 1-July 8)
 +
|-
 +
|Dan Dale  ||  1 week (not available July 1-July 8)
 +
|-
 +
|Tony Forest  ||  2 weeks (not available July 1-July 8)
 +
|-
 +
|Dustin McNulty  ||  1 week
 +
|-
 +
|Sadiq Setiniyaz ||  2+ weeks
 +
|-
 +
|Yujong Kim  ||  2 weeks (Available May 1 to June 30 but not available May 20-25)
 
|-
 
|-
 
|}
 
|}
  
 +
 +
[[2012AnnihCountrRateEstimate]]
  
 
[[Positrons]]
 
[[Positrons]]

Latest revision as of 17:56, 16 February 2012

Run Configuration

Positrons may be In May

The main electron beam current needs to be limited to 10 nA using a beam line cavity.

Currently max energy is 7.8 MeV.

Choosing 6.3 MeV incident electron energy because that is the most stable.

[math]\sigma[/math] = 0.5 mm on the Tungsten target (T1)

Date Task/Item
Feb. 2, 2012 Readiness Review
May , 2012 Readiness Review

Manpower

Collaborator available
Phil Cole 1 week (not available July 1-July 8)
Dan Dale 1 week (not available July 1-July 8)
Tony Forest 2 weeks (not available July 1-July 8)
Dustin McNulty 1 week
Sadiq Setiniyaz 2+ weeks
Yujong Kim 2 weeks (Available May 1 to June 30 but not available May 20-25)


2012AnnihCountrRateEstimate

Positrons