Difference between revisions of "PePPO 2012Run"
Jump to navigation
Jump to search
(Created page with ' Jan 22, 2012 Readiness Review Positrons') |
|||
(12 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | =Run Configuration= | ||
− | |||
+ | Positrons may be In May | ||
+ | |||
+ | The main electron beam current needs to be limited to 10 nA using a beam line cavity. | ||
+ | |||
+ | Currently max energy is 7.8 MeV. | ||
+ | |||
+ | Choosing 6.3 MeV incident electron energy because that is the most stable. | ||
+ | |||
+ | <math>\sigma</math> = 0.5 mm on the Tungsten target (T1) | ||
+ | |||
+ | {| border="1" |cellpadding="20" cellspacing="0 | ||
+ | |- | ||
+ | |Date || Task/Item | ||
+ | |- | ||
+ | |Feb. 2, 2012 || Readiness Review | ||
+ | |- | ||
+ | |May , 2012 || Readiness Review | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | =Manpower= | ||
+ | |||
+ | {| border="1" |cellpadding="20" cellspacing="0 | ||
+ | |- | ||
+ | |Collaborator || available | ||
+ | |- | ||
+ | |Phil Cole || 1 week (not available July 1-July 8) | ||
+ | |- | ||
+ | |Dan Dale || 1 week (not available July 1-July 8) | ||
+ | |- | ||
+ | |Tony Forest || 2 weeks (not available July 1-July 8) | ||
+ | |- | ||
+ | |Dustin McNulty || 1 week | ||
+ | |- | ||
+ | |Sadiq Setiniyaz || 2+ weeks | ||
+ | |- | ||
+ | |Yujong Kim || 2 weeks (Available May 1 to June 30 but not available May 20-25) | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | |||
+ | [[2012AnnihCountrRateEstimate]] | ||
[[Positrons]] | [[Positrons]] |
Latest revision as of 17:56, 16 February 2012
Run Configuration
Positrons may be In May
The main electron beam current needs to be limited to 10 nA using a beam line cavity.
Currently max energy is 7.8 MeV.
Choosing 6.3 MeV incident electron energy because that is the most stable.
= 0.5 mm on the Tungsten target (T1)
Date | Task/Item |
Feb. 2, 2012 | Readiness Review |
May , 2012 | Readiness Review |
Manpower
Collaborator | available |
Phil Cole | 1 week (not available July 1-July 8) |
Dan Dale | 1 week (not available July 1-July 8) |
Tony Forest | 2 weeks (not available July 1-July 8) |
Dustin McNulty | 1 week |
Sadiq Setiniyaz | 2+ weeks |
Yujong Kim | 2 weeks (Available May 1 to June 30 but not available May 20-25) |