Difference between revisions of "Beamline Drawing 2011 J.Ellis"

From New IAC Wiki
Jump to navigation Jump to search
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
Below is the Beamline sketch
 
Below is the Beamline sketch
  
[[File:03242011_HRRL_BeamLineSketch.png | 200 px]]
+
[[File:HRRL03242011_dwg.png | 600 px]]
 +
 
 +
[[File:HRRL_BeamLine_03302011.pdf]]
  
 
{| border="1" cellpadding="5" cellspacing="0"
 
{| border="1" cellpadding="5" cellspacing="0"
| Label || Beam Line Element|| Z location from Gate Valve || Dimensions of Element
+
| Label || Beam Line Element|| Z location from Gate Valve center of element || Dimensions of Element
 +
|-
 +
|T1||Torroid 1 ||  -0.05 m||
 
|-
 
|-
 
|G1|| Fast Gate Valve || 0.000 m ||
 
|G1|| Fast Gate Valve || 0.000 m ||
 
|-
 
|-
|STXY1|| X-Y steerers 1 ||  ||
+
|STXY1|| X-Y steerers 1 ||  || want to locate before Q1!
 
|-
 
|-
|Q1 || First Quad|| 0.175 m ||
+
|Q1 || First Quad|| 0.195 m || (was moved from 0.175 to 0.195)
 
|-
 
|-
|Q2 || Second Quad ||0.425 m ||
+
|Q2 || Second Quad ||0.435 m || (was moved from 0.425 to 0.435)  (24 cm to Q1)
 
|-
 
|-
|Q3|| Third Quad || 0.675 m ||
+
|Q3|| Third Quad || 0.675 m ||(24 cm to Q2)
 
|-
 
|-
 
|STXY2|| X-Y steerers 2 ||  ||
 
|STXY2|| X-Y steerers 2 ||  ||
Line 20: Line 24:
 
|Targ1 || positron production target || 1.175 m ||
 
|Targ1 || positron production target || 1.175 m ||
 
|-
 
|-
|Q4 || Fourth Quad ||1.400 m  ||  
+
|Q4 || Fourth Quad ||1.635 m  || (was 1.4 now 1.635)
 
|-
 
|-
|Q5|| Fifth Quad || 1.650 m  || 1.6 (Yujong has 5 cm more space between quads)
+
|Q5|| Fifth Quad || 1.659 m  || was 1.650 drawing has 1.899 we want it at 1.659  (want distance to Q4 to be 24 cm)
 
|-
 
|-
|Q6 || Sixth Quad || 1.8 ||
+
|Q6 || Sixth Quad || 1.683||was at 1.8 drawing has it at 2.163 we want it at 1.683 (want distance to Q5 to be 24 cm)
 
|-
 
|-
 
|STXY3|| X-Y steerers 3 ||  ||
 
|STXY3|| X-Y steerers 3 ||  ||
Line 32: Line 36:
 
|FC1 || Faraday Cup 1 || ||
 
|FC1 || Faraday Cup 1 || ||
 
|-
 
|-
|D1 || First Kiwi Dipole  || 2.525 m  || 2.201 (Yujong has 22.4 cm more distance between last quad and dipole)
+
|D1 || First Kiwi Dipole  || 2.702 m  || was 2.525 now it is 2.702
 
|-
 
|-
|SLIT || 2.851 m
+
|S1 || Energy Slits  || 3.076 m || was 2.851 now at 3.076
 
|-
 
|-
 
|STXY4|| X-Y steerers 4 ||  ||
 
|STXY4|| X-Y steerers 4 ||  ||
 
|-
 
|-
|Q7 || Seventh Quad || 3.026 m ||  
+
|Q7 || Seventh Quad || 3.317 m || was at 3.026 now at 3.317
 
|-
 
|-
|F1 || Yag SCREEN || 3.296 m ||
+
|F2 || Yag SCREEN || m || attach directly to Dipole D2 and put bellows upstream, drawing has it backwards
 
|-
 
|-
|D2 || Second Kiwi Dipole || 3.617 m ||
+
|D2 || Second Kiwi Dipole || 4.019 m || was at 3.617 now at 4.019
 
|-
 
|-
|Q8 || Eigth Quad ||4.063 m ||   
+
|Q8 || Eigth Quad ||4.616 m ||   
 
|-
 
|-
 
|STXY5|| X-Y steerers 5 ||  ||
 
|STXY5|| X-Y steerers 5 ||  ||
 
|-
 
|-
|Q9 || Quad || 4.603 m ||
+
|Q9 || Quad || 5.026 m ||
 +
|-
 +
|Q10 || Quad ||5.436 m ||
 
|-
 
|-
|Q10 || Quad ||5.143 m ||
+
|T2 || Torroid 2 || ||
 
|-
 
|-
|SCREEN || 5.712 m  
+
|F3 || Third Flag || 5.976 m ||
 
|-
 
|-
|2NDTG || 6.112 m  
+
|Targ2 || Brehm target ladder ||  m ||
 
|-
 
|-
|HOLE@WALL || 6.412 m
+
| || HOLE@WALL || 6.412 m ||
 
|}
 
|}
  
 
[[Positrons]]
 
[[Positrons]]

Latest revision as of 00:10, 3 May 2011

Below is the Beamline sketch

HRRL03242011 dwg.png

File:HRRL BeamLine 03302011.pdf

Label Beam Line Element Z location from Gate Valve center of element Dimensions of Element
T1 Torroid 1 -0.05 m
G1 Fast Gate Valve 0.000 m
STXY1 X-Y steerers 1 want to locate before Q1!
Q1 First Quad 0.195 m (was moved from 0.175 to 0.195)
Q2 Second Quad 0.435 m (was moved from 0.425 to 0.435) (24 cm to Q1)
Q3 Third Quad 0.675 m (24 cm to Q2)
STXY2 X-Y steerers 2
Targ1 positron production target 1.175 m
Q4 Fourth Quad 1.635 m (was 1.4 now 1.635)
Q5 Fifth Quad 1.659 m was 1.650 drawing has 1.899 we want it at 1.659 (want distance to Q4 to be 24 cm)
Q6 Sixth Quad 1.683 was at 1.8 drawing has it at 2.163 we want it at 1.683 (want distance to Q5 to be 24 cm)
STXY3 X-Y steerers 3
F1 OTR Flag
FC1 Faraday Cup 1
D1 First Kiwi Dipole 2.702 m was 2.525 now it is 2.702
S1 Energy Slits 3.076 m was 2.851 now at 3.076
STXY4 X-Y steerers 4
Q7 Seventh Quad 3.317 m was at 3.026 now at 3.317
F2 Yag SCREEN m attach directly to Dipole D2 and put bellows upstream, drawing has it backwards
D2 Second Kiwi Dipole 4.019 m was at 3.617 now at 4.019
Q8 Eigth Quad 4.616 m
STXY5 X-Y steerers 5
Q9 Quad 5.026 m
Q10 Quad 5.436 m
T2 Torroid 2
F3 Third Flag 5.976 m
Targ2 Brehm target ladder m
HOLE@WALL 6.412 m

Positrons