Difference between revisions of "PhotoFiss 3-8-11"
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | [https://wiki.iac.isu.edu/index.php/ | + | [https://wiki.iac.isu.edu/index.php/Feb_PhotFisRun_44MeV_March_2011 Go Back] |
=TDC Map= | =TDC Map= | ||
Line 44: | Line 44: | ||
| Date || Run Number || Comment || Run Time | | Date || Run Number || Comment || Run Time | ||
|- | |- | ||
− | | 3/8/11 || 1938 || Beam down, D2O target || 25 minutes | + | | 3/8/11 || 1938 || Beam down, D2O target, radiator in || 25 minutes |
|- | |- | ||
− | | 3/8/11 || 1939 || Beam down, D2O target || 10 minutes | + | | 3/8/11 || 1939 || Beam down, D2O target, radiator in || 10 minutes |
|- | |- | ||
− | | 3/8/11 || 1940 || Beam down, D2O target || 60 minutes | + | | 3/8/11 || 1940 || Beam down, D2O target, radiator in || 60 minutes |
|- | |- | ||
− | | 3/8/11 || 1941 || Beam up, D2O target || 75 minutes | + | | 3/8/11 || 1941 || Beam up, D2O target, radiator in || 75 minutes |
|- | |- | ||
− | | 3/8/11 || 1944 || Beam down, D2O target || 55 minutes | + | | 3/8/11 || 1944 || Beam down, D2O target, radiator in || 55 minutes |
|- | |- | ||
− | | 3/8/11 || 1945 || Beam up, D2O target || 75 minutes | + | | 3/8/11 || 1945 || Beam up, D2O target, radiator in || 75 minutes |
|- | |- | ||
− | | 3/8/11 || || | + | | 3/8/11 || 1946 || Beam up, D2O target, radiator out || 15 minutes |
|- | |- | ||
− | | 3/8/11 || || | + | | 3/8/11 || 1947 || Beam up, H2O target, radiator in || 15 minutes |
|- | |- | ||
− | | 3/8/11 || || | + | | 3/8/11 || 1948 || Beam down, H2O target, radiator in || 15 minutes |
|- | |- | ||
− | | 3/8/11 || || | + | | 3/8/11 || 1949 || Beam down, DU target, radiator in || 20 minutes |
− | |||
− | |||
|} | |} | ||
Line 76: | Line 74: | ||
[[File:3-8-11_4.png | 200 px]] | [[File:3-8-11_4.png | 200 px]] | ||
− | Above is a scope picture of TDC start (light blue), stop out from the discriminator (Ortec CF8000)(dark blue), and the gun pulse (green). The TDC is operated between the fall of the start and the rise of the stop. | + | Above is a scope picture of TDC start (light blue), stop out from the discriminator (Ortec CF8000)(dark blue), and the gun pulse (green). The TDC is operated between the fall of the start and the rise of the stop (100ns). |
[[File:3-8-11_5.png | 200 px]] | [[File:3-8-11_5.png | 200 px]] | ||
Line 87: | Line 85: | ||
[[File:3-8-11_7.png | 200 px]] | [[File:3-8-11_7.png | 200 px]] | ||
+ | [[File:3-8-11_8.png | 200 px]] | ||
+ | |||
+ | Above are scope pictures of Natali double pulsing. The purple trace is the NIM output of the level translator. The yellow trace is the analog signal from Natali out of the back of the constant fraction discriminator (Ortec CF8000). Natali was operating at a high voltage of -1800 V and a threshold of 203 mV. | ||
− | + | =Lab Book= | |
+ | [[File:March8.pdf]] | ||
− | [https://wiki.iac.isu.edu/index.php/ | + | [https://wiki.iac.isu.edu/index.php/Feb_PhotFisRun_44MeV_March_2011 Go Back] |
Latest revision as of 16:53, 1 April 2011
TDC Map
TDC Chan | Detector |
1 | Event Trigger |
12 | Sofiia (neutron detector Beam Right down) |
13 | Natali (neutron detector Beam Left down) |
14 | Irina (neutron detector Beam left center) |
15 | Polina (neutron detector Beam left top) |
Scalers
TDC Chan | Detector |
2 | Sofiia-scaler (neutron detector Beam Right down) |
4 | Natali-scaler (neutron detector Beam Left down) |
5 | Irina-scaler (neutron detector Beam left center) |
6 | Polina-scaler (neutron detector Beam left top) |
Runs
Date | Run Number | Comment | Run Time |
3/8/11 | 1938 | Beam down, D2O target, radiator in | 25 minutes |
3/8/11 | 1939 | Beam down, D2O target, radiator in | 10 minutes |
3/8/11 | 1940 | Beam down, D2O target, radiator in | 60 minutes |
3/8/11 | 1941 | Beam up, D2O target, radiator in | 75 minutes |
3/8/11 | 1944 | Beam down, D2O target, radiator in | 55 minutes |
3/8/11 | 1945 | Beam up, D2O target, radiator in | 75 minutes |
3/8/11 | 1946 | Beam up, D2O target, radiator out | 15 minutes |
3/8/11 | 1947 | Beam up, H2O target, radiator in | 15 minutes |
3/8/11 | 1948 | Beam down, H2O target, radiator in | 15 minutes |
3/8/11 | 1949 | Beam down, DU target, radiator in | 20 minutes |
Scope Pictures
The following scope pictures have beam parameters of 25 MeV beam energy, 0.5 A current and a 2 ns pulse width.
Above is a scope picture of the analog signal from the neutron detector Natali inside the gun pulse start signal. The purple signal is the NIM pulse from the level translator (Model PS726).
Above is a scope picture of TDC start (light blue), stop out from the discriminator (Ortec CF8000)(dark blue), and the gun pulse (green). The TDC is operated between the fall of the start and the rise of the stop (100ns).
Above has the gun pulse in green and the start trigger for the VME crate as light blue.
Above is a closeup of the trigger start for the VME crate.
Above are scope pictures of Natali double pulsing. The purple trace is the NIM output of the level translator. The yellow trace is the analog signal from Natali out of the back of the constant fraction discriminator (Ortec CF8000). Natali was operating at a high voltage of -1800 V and a threshold of 203 mV.