Difference between revisions of "Beamline design (Y. Kim)"
Jump to navigation
Jump to search
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
= Beam Line Design= | = Beam Line Design= | ||
[[File:BeamLine_Yim_10-14-10.png | 400 px]] | [[File:BeamLine_Yim_10-14-10.png | 400 px]] | ||
+ | |||
+ | |||
+ | Need: more X-Y steerers(1 set after 1st triplet), belows at the exit of Linac, Torroid loop at exit of Linac, fast shutdown valve at Linac exit. | ||
== Distances== | == Distances== | ||
{| border="1" cellpadding="5" cellspacing="0" | {| border="1" cellpadding="5" cellspacing="0" | ||
|- | |- | ||
− | | Element || Distance to Center | + | | Element || Distance to Center || Stancari Design |
|- | |- | ||
|End of LinacGate Valve || 0.000 m | |End of LinacGate Valve || 0.000 m | ||
Line 19: | Line 22: | ||
|1STTG || 1.175 m | |1STTG || 1.175 m | ||
|- | |- | ||
− | |Q1@T2 || 1.400 m | + | |Q1@T2 || 1.400 m || 1.4 |
|- | |- | ||
− | |Q2@T2|| 1.650 m | + | |Q2@T2|| 1.650 m || 1.6 (Yujong has 5 cm more space between quads) |
|- | |- | ||
− | |Q3@T2 || 1.900 m | + | |Q3@T2 || 1.900 m || 1.8 |
|- | |- | ||
|TCOL2 || 2.250 m | |TCOL2 || 2.250 m | ||
|- | |- | ||
− | |KIWI1 || 2.525 m | + | |KIWI1 || 2.525 m || 2.201 (Yujong has 22.4 cm more distance between last quad and dipole) |
|- | |- | ||
|SLIT || 2.851 m | |SLIT || 2.851 m | ||
|- | |- | ||
− | |Q1@DM || 3.026 m | + | |Q1@DM || 3.026 m || 2.615 (Yujong has 8.7 more cm between dipole and quad) |
|- | |- | ||
|SCREEN || 3.296 m | |SCREEN || 3.296 m | ||
Line 37: | Line 40: | ||
|KIWI2 || 3.617 m | |KIWI2 || 3.617 m | ||
|- | |- | ||
− | |Q1@T3 || 4.063 m | + | |Q1@T3 || 4.063 m || Yujong has 29.1 cm leess distance between last dipole and quad) |
|- | |- | ||
|Q2@T3 || 4.603 m | |Q2@T3 || 4.603 m | ||
Line 60: | Line 63: | ||
=Expected electron Transmission= | =Expected electron Transmission= | ||
+ | |||
+ | ;Assuming a 9 mm wide slit in between the kiwi dipoles. | ||
[[File:HRRL_E-transmission_10-14-10.png | 200 px]] | [[File:HRRL_E-transmission_10-14-10.png | 200 px]] | ||
+ | |||
+ | = Expected electron profile after last Kiwi dipole= | ||
+ | |||
+ | [[File:HRRL_e-Profil_10-14-10.png | 200 px]] |
Latest revision as of 18:53, 21 March 2011
Beam Line Design
Need: more X-Y steerers(1 set after 1st triplet), belows at the exit of Linac, Torroid loop at exit of Linac, fast shutdown valve at Linac exit.
Distances
Element | Distance to Center | Stancari Design |
End of LinacGate Valve | 0.000 m | |
Q1@T1 | 0.175 m | |
Q2@T1 | 0.425 m | |
Q3@T1 | 0.675 m | |
TCOL1 | 1.025 m | |
1STTG | 1.175 m | |
Q1@T2 | 1.400 m | 1.4 |
Q2@T2 | 1.650 m | 1.6 (Yujong has 5 cm more space between quads) |
Q3@T2 | 1.900 m | 1.8 |
TCOL2 | 2.250 m | |
KIWI1 | 2.525 m | 2.201 (Yujong has 22.4 cm more distance between last quad and dipole) |
SLIT | 2.851 m | |
Q1@DM | 3.026 m | 2.615 (Yujong has 8.7 more cm between dipole and quad) |
SCREEN | 3.296 m | |
KIWI2 | 3.617 m | |
Q1@T3 | 4.063 m | Yujong has 29.1 cm leess distance between last dipole and quad) |
Q2@T3 | 4.603 m | |
Q3@T3 | 5.143 m | |
SCREEN | 5.712 m | |
2NDTG | 6.112 m | |
HOLE@WALL | 6.412 m |
Beam Optics
Beam Size
Expected electron Transmission
- Assuming a 9 mm wide slit in between the kiwi dipoles.