Beamline design (Y. Kim): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
| (10 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
= Beam Line Design= | |||
[[File:BeamLine_Yim_10-14-10.png | 400 px]] | [[File:BeamLine_Yim_10-14-10.png | 400 px]] | ||
End of LinacGate Valve | Need: more X-Y steerers(1 set after 1st triplet), belows at the exit of Linac, Torroid loop at exit of Linac, fast shutdown valve at Linac exit. | ||
Q1@T1 | |||
Q2@T1 | == Distances== | ||
Q3@T1 | {| border="1" cellpadding="5" cellspacing="0" | ||
TCOL1 | |- | ||
1STTG | | Element || Distance to Center || Stancari Design | ||
Q1@T2 | |- | ||
Q2@T2 | |End of LinacGate Valve || 0.000 m | ||
Q3@T2 | |- | ||
TCOL2 | |Q1@T1 || 0.175 m | ||
KIWI1 | |- | ||
SLIT | |Q2@T1 || 0.425 m | ||
Q1@DM | |- | ||
SCREEN | |Q3@T1 || 0.675 m | ||
KIWI2 | |- | ||
Q1@T3 | |TCOL1 || 1.025 m | ||
Q2@T3 | |- | ||
Q3@T3 | |1STTG || 1.175 m | ||
SCREEN | |- | ||
2NDTG | |Q1@T2 || 1.400 m || 1.4 | ||
HOLE@WALL | |- | ||
|Q2@T2|| 1.650 m || 1.6 (Yujong has 5 cm more space between quads) | |||
|- | |||
|Q3@T2 || 1.900 m || 1.8 | |||
|- | |||
|TCOL2 || 2.250 m | |||
|- | |||
|KIWI1 || 2.525 m || 2.201 (Yujong has 22.4 cm more distance between last quad and dipole) | |||
|- | |||
|SLIT || 2.851 m | |||
|- | |||
|Q1@DM || 3.026 m || 2.615 (Yujong has 8.7 more cm between dipole and quad) | |||
|- | |||
|SCREEN || 3.296 m | |||
|- | |||
|KIWI2 || 3.617 m | |||
|- | |||
|Q1@T3 || 4.063 m || Yujong has 29.1 cm leess distance between last dipole and quad) | |||
|- | |||
|Q2@T3 || 4.603 m | |||
|- | |||
|Q3@T3 || 5.143 m | |||
|- | |||
|SCREEN || 5.712 m | |||
|- | |||
|2NDTG || 6.112 m | |||
|- | |||
|HOLE@WALL || 6.412 m | |||
|} | |||
=Beam Optics= | |||
[[File:Kim_HRRL_Optics_10-14-10.png| 200 px]] | |||
=Beam Size= | |||
[[File:HRRL_BeamSize_10-14-10.png|200 px]] | |||
=Expected electron Transmission= | |||
;Assuming a 9 mm wide slit in between the kiwi dipoles. | |||
[[File:HRRL_E-transmission_10-14-10.png | 200 px]] | |||
= Expected electron profile after last Kiwi dipole= | |||
[[File:HRRL_e-Profil_10-14-10.png | 200 px]] | |||
Latest revision as of 18:53, 21 March 2011
Beam Line Design
Need: more X-Y steerers(1 set after 1st triplet), belows at the exit of Linac, Torroid loop at exit of Linac, fast shutdown valve at Linac exit.
Distances
| Element | Distance to Center | Stancari Design |
| End of LinacGate Valve | 0.000 m | |
| Q1@T1 | 0.175 m | |
| Q2@T1 | 0.425 m | |
| Q3@T1 | 0.675 m | |
| TCOL1 | 1.025 m | |
| 1STTG | 1.175 m | |
| Q1@T2 | 1.400 m | 1.4 |
| Q2@T2 | 1.650 m | 1.6 (Yujong has 5 cm more space between quads) |
| Q3@T2 | 1.900 m | 1.8 |
| TCOL2 | 2.250 m | |
| KIWI1 | 2.525 m | 2.201 (Yujong has 22.4 cm more distance between last quad and dipole) |
| SLIT | 2.851 m | |
| Q1@DM | 3.026 m | 2.615 (Yujong has 8.7 more cm between dipole and quad) |
| SCREEN | 3.296 m | |
| KIWI2 | 3.617 m | |
| Q1@T3 | 4.063 m | Yujong has 29.1 cm leess distance between last dipole and quad) |
| Q2@T3 | 4.603 m | |
| Q3@T3 | 5.143 m | |
| SCREEN | 5.712 m | |
| 2NDTG | 6.112 m | |
| HOLE@WALL | 6.412 m |
Beam Optics
Beam Size
Expected electron Transmission
- Assuming a 9 mm wide slit in between the kiwi dipoles.