Difference between revisions of "Things That Still Need to Get Done"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| (6 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | + | * Vacuum pipe and radiator ladder (design)  | |
| + | [[Image:ndetector.jpg|thumb|Data Acquisition Electronics|300 px]]  | ||
| − | + | * Graphite block with Pb sheet (design /  fabrication)  | |
| − | + | * Pb collimator (design /  fabrication)  | |
| − | + | * d<sub>2</sub>0 target  | |
| − | + | * d<sub>2</sub>0 target mount  | |
| − | + | * Get n<sup>o</sup> detectors; high voltage (check them out)  | |
| − | + | * n<sup>o</sup> detector mount / shielding (design /  fabrication)  | |
| − | + | * Data acquisition electronics   <math>\rightarrow</math> <math>\rightarrow</math> <math>\rightarrow</math> <math>\rightarrow</math> <math>\rightarrow</math> <math>\rightarrow</math>  | |
| − | * Discriminators  | + | ** Discriminators  | 
| + | ** Scalers  | ||
| + | ** Take the digital pulse, send it into a counter (scaler), and it gives us a number.  | ||
| − | *   | + | * Callibration procedure  | 
| − | *  | + | * Beam position monitoring  | 
| − | + | [http://wiki.iac.isu.edu/index.php/PhotoFission_with_Polarized_Photons_from_HRRL Go Back]  | |
| − | |||
| − | |||
| − | |||
| − | |||
Latest revision as of 06:27, 5 February 2009
- Vacuum pipe and radiator ladder (design)
 
- Graphite block with Pb sheet (design / fabrication)
 
- Pb collimator (design / fabrication)
 
- d20 target
 
- d20 target mount
 
- Get no detectors; high voltage (check them out)
 
- no detector mount / shielding (design / fabrication)
 
- Data acquisition electronics        
- Discriminators
 - Scalers
 - Take the digital pulse, send it into a counter (scaler), and it gives us a number.
 
 
- Callibration procedure
 
- Beam position monitoring