Difference between revisions of "CH DD Ga"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
First gallium sample removed from source vault at 4:00pm, 9/4/22. Inserted into shielded HPGe tunnel at 4:01pm and covered. -> Run number: r7231. | First gallium sample removed from source vault at 4:00pm, 9/4/22. Inserted into shielded HPGe tunnel at 4:01pm and covered. -> Run number: r7231. | ||
+ | |||
+ | * 3.1 days (267960 seconds) spent with surface contact with Cf252 source. | ||
---- | ---- |
Latest revision as of 22:05, 4 September 2022
First gallium sample deposited into source vault at 1:34pm, 9/1/22.
Background run for sample 1: r7229
First gallium sample removed from source vault at 4:00pm, 9/4/22. Inserted into shielded HPGe tunnel at 4:01pm and covered. -> Run number: r7231.
- 3.1 days (267960 seconds) spent with surface contact with Cf252 source.