Difference between revisions of "CH DD Ga"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
Background run for sample 1: r7229  | Background run for sample 1: r7229  | ||
| + | |||
| + | First gallium sample removed from source vault at 4:00pm, 9/4/22. Inserted into shielded HPGe tunnel at 4:01pm and covered. -> Run number: r7231.  | ||
| + | |||
| + | * 3.1 days (267960 seconds) spent with surface contact with Cf252 source.   | ||
----  | ----  | ||
Latest revision as of 22:05, 4 September 2022
First gallium sample deposited into source vault at 1:34pm, 9/1/22.
Background run for sample 1: r7229
First gallium sample removed from source vault at 4:00pm, 9/4/22. Inserted into shielded HPGe tunnel at 4:01pm and covered. -> Run number: r7231.
- 3.1 days (267960 seconds) spent with surface contact with Cf252 source.