11/1/2013

Goals
  1. Confirm signals on all of Sector 5's sense wires
  2. Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
  3. After the above is completed, stop gas flow, Install dust covers, prepare for shipping
  4. Test TDC integrity using DAQ and S1
11/8/2013
Worked with Haitham on Sector 5
Moved Kraken to SL2
Began confirming signals on S5 sense wires [1]
Add missing oscilloscope image SL2-STB6-K1200872 U10
Confirmed with Haitham that HV burin is completed for SL2
Rotated Sector 3 with David
Available times
Monday 9-5