Difference between revisions of "AW CLAS12R1"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
:Worked with Haitham on Sector 5 | :Worked with Haitham on Sector 5 | ||
:Moved Kraken to SL2 | :Moved Kraken to SL2 | ||
− | :Began confirming signals on S5 sense wires | + | :Began confirming signals on S5 sense wires [https://wiki.iac.isu.edu/index.php/S5_Testing_and_Performance_Summary] |
:Add missing oscilloscope image SL2-STB6-K1200872 U10 | :Add missing oscilloscope image SL2-STB6-K1200872 U10 | ||
:Confirmed with Haitham that HV burin is completed for SL2 | :Confirmed with Haitham that HV burin is completed for SL2 |
Revision as of 16:18, 11 November 2013
11/1/2013
- Goals
- Confirm signals on all of Sector 5's sense wires
- Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
- After the above is completed, stop gas flow, Install dust covers, prepare for shipping
- Test TDC integrity using DAQ and S1
- 11/8/2013
- Worked with Haitham on Sector 5
- Moved Kraken to SL2
- Began confirming signals on S5 sense wires [1]
- Add missing oscilloscope image SL2-STB6-K1200872 U10
- Confirmed with Haitham that HV burin is completed for SL2
- Rotated Sector 3 with David
- Available times
- Monday 9-5
- T,Th 9-3
- W,F 12-5
Weekly progress meeting at 10 am Mondays