;11/8/2013 | ;11/8/2013 | ||
− | Worked with Haitham on Sector 5 | + | :Worked with Haitham on Sector 5 |
#Moved Kraken to SL2 | #Moved Kraken to SL2 | ||
#Began confirming signals on S5 sense wires | #Began confirming signals on S5 sense wires | ||
#Add missing oscilloscope image SL2-STB6-K1200872 U10 | #Add missing oscilloscope image SL2-STB6-K1200872 U10 | ||
− | Confirmed with Haitham that HV burin is completed for SL2 | + | :Confirmed with Haitham that HV burin is completed for SL2 |
:Rotated Sector 3 with David | :Rotated Sector 3 with David | ||
Revision as of 16:15, 11 November 2013
11/1/2013
- Goals
- Confirm signals on all of Sector 5's sense wires
- Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
- After the above is completed, stop gas flow, Install dust covers, prepare for shipping
- Test TDC integrity using DAQ and S1
- 11/8/2013
- Worked with Haitham on Sector 5
- Moved Kraken to SL2
- Began confirming signals on S5 sense wires
- Add missing oscilloscope image SL2-STB6-K1200872 U10
- Confirmed with Haitham that HV burin is completed for SL2
- Rotated Sector 3 with David
- Available times
- Monday 9-5
- T,Th 9-3