Difference between revisions of "AW CLAS12R1"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
#AFter the above is completed, stop gas flow, Install dust covers, prepare for shipping | #AFter the above is completed, stop gas flow, Install dust covers, prepare for shipping | ||
− | Available times | + | ;Available times |
− | + | :Monday 9-5 | |
− | + | :T,Th 9-3 | |
− | + | :W,F 12-5 | |
[[CLAS12_R1]] | [[CLAS12_R1]] |
Revision as of 15:18, 1 November 2013
11/1/2013
- Goals
- Confirm signals on all of Sector 5's sense wires
- Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
- AFter the above is completed, stop gas flow, Install dust covers, prepare for shipping
- Available times
- Monday 9-5
- T,Th 9-3
- W,F 12-5