Line 21: Line 21:
 
|  335  || non-rotatable flanges
 
|  335  || non-rotatable flanges
 
|-
 
|-
|   || 7' + 6' + 3' SS pipe lengths
+
| 329+282+141  || 7' + 6' + 3' SS pipe lengths
 
|-
 
|-
 
|  250  || turning pipe on lathe  
 
|  250  || turning pipe on lathe  
Line 36: Line 36:
 
|  0  || 5 mil  exit window
 
|  0  || 5 mil  exit window
 
|-
 
|-
|  0  || 338 cube for 6 cross
+
|  0  || 338 cube for 6 cross (2" pipe max diameter)
 
|-
 
|-
 
|  221|| glass exit  window for beam view screen
 
|  221|| glass exit  window for beam view screen
Line 44: Line 44:
 
|  268  || 4 non-rotatable flanges
 
|  268  || 4 non-rotatable flanges
 
|-
 
|-
|     || 6 " SS beam pipe
+
|   47  || 6 " SS beam pipe
 
|-
 
|-
 
|  800  || 1 day of labor building 6 way cross
 
|  800  || 1 day of labor building 6 way cross

Latest revision as of 21:49, 28 October 2013

Beam Line Budget

3 week lead time on flanges

goal will be to run on Dec 2 or Dec 9.

Without 6 cross

Cost ($) Description
318 Bellows
158 Hardware (nuts & bolts)
290 5 rotatable flanges
335 non-rotatable flanges
329+282+141 7' + 6' + 3' SS pipe lengths
250 turning pipe on lathe
2400 2 days of labor building beam line components and 1 day installation

With 6 cross

Cost ($) Description
0 5 mil exit window
0 338 cube for 6 cross (2" pipe max diameter)
221 glass exit window for beam view screen
232 4 rotatable flanges
268 4 non-rotatable flanges
47 6 " SS beam pipe
800 1 day of labor building 6 way cross