Difference between revisions of "40MeV BeamLineInstall 10252013"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| (10 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
=Beam Line Budget=  | =Beam Line Budget=  | ||
| − | ==Without   | + | |
| + |  3 week lead time on flanges  | ||
| + | |||
| + | goal will be to run on Dec 2 or Dec 9.  | ||
| + | |||
| + | ==Without 6 cross==  | ||
{| border="1"  |cellpadding="20" cellspacing="0    | {| border="1"  |cellpadding="20" cellspacing="0    | ||
|-  | |-  | ||
| − | |Cost||Description  | + | |Cost ($)||Description  | 
| + | |-  | ||
| + | |  318    || Bellows  | ||
|-  | |-  | ||
| − | |    | + | |  158 || Hardware (nuts & bolts)  | 
|-  | |-  | ||
| − | |    | + | |  290  || 5 rotatable flanges  | 
|-  | |-  | ||
| − | |  3   ||   | + | |  335  || non-rotatable flanges  | 
| + | |-  | ||
| + | |  329+282+141  || 7' + 6' + 3' SS pipe lengths  | ||
| + | |-  | ||
| + | |   250  || turning pipe on lathe   | ||
| + | |-  | ||
| + | |   2400  || 2 days of labor building beam line components and 1 day installation  | ||
|}  | |}  | ||
| Line 19: | Line 32: | ||
{| border="1"  |cellpadding="20" cellspacing="0    | {| border="1"  |cellpadding="20" cellspacing="0    | ||
|-  | |-  | ||
| − | |  | + | |Cost ($)||Description  | 
| + | |-  | ||
| + | |  0   || 5 mil  exit window  | ||
| + | |-  | ||
| + | |  0   || 338 cube for 6 cross (2" pipe max diameter)  | ||
| + | |-  | ||
| + | |  221|| glass exit  window for beam view screen  | ||
| + | |-  | ||
| + | |  232  || 4 rotatable flanges  | ||
|-  | |-  | ||
| − | |    | + | |  268  || 4 non-rotatable flanges  | 
|-  | |-  | ||
| − | |    | + | |   47  || 6 " SS beam pipe  | 
|-  | |-  | ||
| − | |   | + | |   800  || 1 day of labor building 6 way cross  | 
|}  | |}  | ||
[[Positrons_Using_40Mev_Linac#10.2F14.2F13]]  | [[Positrons_Using_40Mev_Linac#10.2F14.2F13]]  | ||
Latest revision as of 21:49, 28 October 2013
Beam Line Budget
3 week lead time on flanges
goal will be to run on Dec 2 or Dec 9.
Without 6 cross
| Cost ($) | Description | 
| 318 | Bellows | 
| 158 | Hardware (nuts & bolts) | 
| 290 | 5 rotatable flanges | 
| 335 | non-rotatable flanges | 
| 329+282+141 | 7' + 6' + 3' SS pipe lengths | 
| 250 | turning pipe on lathe | 
| 2400 | 2 days of labor building beam line components and 1 day installation | 
With 6 cross
| Cost ($) | Description | 
| 0 | 5 mil exit window | 
| 0 | 338 cube for 6 cross (2" pipe max diameter) | 
| 221 | glass exit window for beam view screen | 
| 232 | 4 rotatable flanges | 
| 268 | 4 non-rotatable flanges | 
| 47 | 6 " SS beam pipe | 
| 800 | 1 day of labor building 6 way cross |