=Beam Line Budget=
  
 +
 +
3 week lead time on flanges
 +
 +
goal will be to run on Dec 2 or Dec 9.
 +
 +
==Without 6 cross==
 +
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
|Cost ($)||Description
 +
|-
 +
|  318    || Bellows
 +
|-
 +
|  158 || Hardware (nuts & bolts)
 +
|-
 +
|  290  || 5 rotatable flanges
 +
|-
 +
|  335  || non-rotatable flanges
 +
|-
 +
|  329+282+141  || 7' + 6' + 3' SS pipe lengths
 +
|-
 +
|  250  || turning pipe on lathe
 +
|-
 +
|  2400  || 2 days of labor building beam line components and 1 day installation
 +
|}
 +
 +
== With 6 cross==
 +
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
|Cost ($)||Description
 +
|-
 +
|  0  || 5 mil  exit window
 +
|-
 +
|  0  || 338 cube for 6 cross (2" pipe max diameter)
 +
|-
 +
|  221|| glass exit  window for beam view screen
 +
|-
 +
|  232  || 4 rotatable flanges
 +
|-
 +
|  268  || 4 non-rotatable flanges
 +
|-
 +
|  47  || 6 " SS beam pipe
 +
|-
 +
|  800  || 1 day of labor building 6 way cross
 +
|}
  
  
 
[[Positrons_Using_40Mev_Linac#10.2F14.2F13]]
 
[[Positrons_Using_40Mev_Linac#10.2F14.2F13]]

Latest revision as of 21:49, 28 October 2013

Beam Line Budget

3 week lead time on flanges

goal will be to run on Dec 2 or Dec 9.

Without 6 cross

Cost ($) Description
318 Bellows
158 Hardware (nuts & bolts)
290 5 rotatable flanges
335 non-rotatable flanges
329+282+141 7' + 6' + 3' SS pipe lengths
250 turning pipe on lathe
2400 2 days of labor building beam line components and 1 day installation

With 6 cross

Cost ($) Description
0 5 mil exit window
0 338 cube for 6 cross (2" pipe max diameter)
221 glass exit window for beam view screen
232 4 rotatable flanges
268 4 non-rotatable flanges
47 6 " SS beam pipe
800 1 day of labor building 6 way cross