Difference between revisions of "201310 R1ProgressRep"
(Created page with " =10/18/2013= Current total loose wires we need to fix (try pulling on the pin) on both chambers combined (our only uncertainty in how many additional replacements there could b…") |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
Current total loose wires we need to fix (try pulling on the pin) on both chambers combined (our only uncertainty in how many additional replacements there could be): | Current total loose wires we need to fix (try pulling on the pin) on both chambers combined (our only uncertainty in how many additional replacements there could be): | ||
− | + | ||
Current total known replacement wires that need to be done: | Current total known replacement wires that need to be done: | ||
Line 20: | Line 20: | ||
S2 is aligned for stringing on SL2 - 2 wires left to string on this superlayer before we need to re-align. | S2 is aligned for stringing on SL2 - 2 wires left to string on this superlayer before we need to re-align. | ||
S3 is aligned for stringing on SL1 - 11 wires left to string on this superlayer before we need to re-align. | S3 is aligned for stringing on SL1 - 11 wires left to string on this superlayer before we need to re-align. | ||
+ | |||
+ | Expect to finish restringing the above 33 wires in 2-3 weeks. | ||
+ | |||
+ | |||
+ | Thursday (5pm -> 7pm), Friday (8:30 am -> 4pm), Saturday (9am->4pm) | ||
+ | |||
+ | |||
+ | |||
+ | =10/25/2013= | ||
+ | |||
+ | |||
+ | Current total known replacement wires that need to be done: | ||
+ | |||
+ | S2: 17 wires; 6 field, 11 sense | ||
+ | SL1 - 6 field, 9 sense | ||
+ | SL2 - 2 sense '''(done)''' | ||
+ | |||
+ | S3: 16 wires; 14 field, 2 sense | ||
+ | SL1 - 10 field, 1 sense (found broken sense) | ||
+ | SL2 - 4 field, 1 sense | ||
+ | |||
+ | |||
+ | ==Prepare to Ship 2 chambers== | ||
+ | |||
+ | S6 is boxed up and ready to go on a pallet | ||
+ | |||
+ | S5: Pictures taken on most sense wires, SL1 has almost 3 Ua of current draw (need to debug), need to box it up unless we ship S1. | ||
+ | |||
+ | Ship back equipment: ship one of the A-Frames and associated equipment for stringing one chamber. | ||
+ | |||
+ | ==Measure Sense wire tensions as a function of Sector position== | ||
+ | |||
+ | How do the sense wire tensions change with sector position (i.e. gravity)? | ||
+ | |||
+ | ==Endplate survey== | ||
+ | |||
+ | |||
+ | =10/28/13= | ||
+ | |||
+ | The URL below will take you to Mac | ||
+ | |||
+ | http://clasweb.jlab.org/group_meeting_minutes/Physics/talks_2013/mestayer_10_14.pdf | ||
+ | |||
+ | |||
[[CLAS12_R1_Progress_Reports]] | [[CLAS12_R1_Progress_Reports]] |
Latest revision as of 21:19, 28 October 2013
10/18/2013
Current total loose wires we need to fix (try pulling on the pin) on both chambers combined (our only uncertainty in how many additional replacements there could be):
Current total known replacement wires that need to be done:
S2: 17 wires; 6 field, 11 sense SL1 - 6 field, 9 sense SL2 - 2 sense
S3: 16 wires; 14 field, 2 sense SL1 - 10 field, 1 sense SL2 - 4 field, 1 sense
Total wires left to replace between both chambers: 33
S2 is aligned for stringing on SL2 - 2 wires left to string on this superlayer before we need to re-align. S3 is aligned for stringing on SL1 - 11 wires left to string on this superlayer before we need to re-align.
Expect to finish restringing the above 33 wires in 2-3 weeks.
Thursday (5pm -> 7pm), Friday (8:30 am -> 4pm), Saturday (9am->4pm)
10/25/2013
Current total known replacement wires that need to be done:
S2: 17 wires; 6 field, 11 sense SL1 - 6 field, 9 sense SL2 - 2 sense (done)
S3: 16 wires; 14 field, 2 sense SL1 - 10 field, 1 sense (found broken sense) SL2 - 4 field, 1 sense
Prepare to Ship 2 chambers
S6 is boxed up and ready to go on a pallet
S5: Pictures taken on most sense wires, SL1 has almost 3 Ua of current draw (need to debug), need to box it up unless we ship S1.
Ship back equipment: ship one of the A-Frames and associated equipment for stringing one chamber.
Measure Sense wire tensions as a function of Sector position
How do the sense wire tensions change with sector position (i.e. gravity)?
Endplate survey
10/28/13
The URL below will take you to Mac
http://clasweb.jlab.org/group_meeting_minutes/Physics/talks_2013/mestayer_10_14.pdf