Difference between revisions of "201310 R1ProgressRep"

From New IAC Wiki
Jump to navigation Jump to search
(Created page with " =10/18/2013= Current total loose wires we need to fix (try pulling on the pin) on both chambers combined (our only uncertainty in how many additional replacements there could b…")
 
 
(5 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
Current total loose wires we need to fix (try pulling on the pin) on both chambers combined (our only uncertainty in how many additional replacements there could be):
 
Current total loose wires we need to fix (try pulling on the pin) on both chambers combined (our only uncertainty in how many additional replacements there could be):
  
6
+
 
  
 
Current total known replacement wires that need to be done:
 
Current total known replacement wires that need to be done:
Line 20: Line 20:
 
S2 is aligned for stringing on SL2 - 2 wires left to string on this superlayer before we need to re-align.
 
S2 is aligned for stringing on SL2 - 2 wires left to string on this superlayer before we need to re-align.
 
S3 is aligned for stringing on SL1 - 11 wires left to string on this superlayer before we need to re-align.
 
S3 is aligned for stringing on SL1 - 11 wires left to string on this superlayer before we need to re-align.
 +
 +
Expect to finish restringing the above 33 wires in 2-3 weeks.
 +
 +
 +
Thursday (5pm -> 7pm), Friday (8:30 am -> 4pm), Saturday (9am->4pm)
 +
 +
 +
 +
=10/25/2013=
 +
 +
 +
Current total known replacement wires that need to be done:
 +
 +
S2: 17 wires; 6 field, 11 sense
 +
SL1 - 6 field, 9 sense
 +
SL2 - 2 sense '''(done)'''
 +
 +
S3: 16 wires; 14 field, 2 sense
 +
SL1 - 10 field, 1 sense (found broken sense)
 +
SL2 - 4 field, 1 sense
 +
 +
 +
==Prepare to Ship 2 chambers==
 +
 +
S6 is boxed up and ready to go on a pallet
 +
 +
S5: Pictures taken on most sense wires, SL1 has almost 3 Ua of current draw (need to debug), need to box it up unless we ship S1.
 +
 +
Ship back equipment: ship one of the A-Frames and associated equipment for stringing one chamber.
 +
 +
==Measure Sense wire tensions as a function of Sector position==
 +
 +
How do the sense wire tensions change with sector position (i.e. gravity)?
 +
 +
==Endplate survey==
 +
 +
 +
=10/28/13=
 +
 +
The URL below will take you to Mac
 +
 +
http://clasweb.jlab.org/group_meeting_minutes/Physics/talks_2013/mestayer_10_14.pdf
 +
 +
  
  
 
[[CLAS12_R1_Progress_Reports]]
 
[[CLAS12_R1_Progress_Reports]]

Latest revision as of 21:19, 28 October 2013

10/18/2013

Current total loose wires we need to fix (try pulling on the pin) on both chambers combined (our only uncertainty in how many additional replacements there could be):


Current total known replacement wires that need to be done:

S2: 17 wires; 6 field, 11 sense SL1 - 6 field, 9 sense SL2 - 2 sense

S3: 16 wires; 14 field, 2 sense SL1 - 10 field, 1 sense SL2 - 4 field, 1 sense

Total wires left to replace between both chambers: 33

S2 is aligned for stringing on SL2 - 2 wires left to string on this superlayer before we need to re-align. S3 is aligned for stringing on SL1 - 11 wires left to string on this superlayer before we need to re-align.

Expect to finish restringing the above 33 wires in 2-3 weeks.


Thursday (5pm -> 7pm), Friday (8:30 am -> 4pm), Saturday (9am->4pm)


10/25/2013

Current total known replacement wires that need to be done:

S2: 17 wires; 6 field, 11 sense SL1 - 6 field, 9 sense SL2 - 2 sense (done)

S3: 16 wires; 14 field, 2 sense SL1 - 10 field, 1 sense (found broken sense) SL2 - 4 field, 1 sense


Prepare to Ship 2 chambers

S6 is boxed up and ready to go on a pallet

S5: Pictures taken on most sense wires, SL1 has almost 3 Ua of current draw (need to debug), need to box it up unless we ship S1.

Ship back equipment: ship one of the A-Frames and associated equipment for stringing one chamber.

Measure Sense wire tensions as a function of Sector position

How do the sense wire tensions change with sector position (i.e. gravity)?

Endplate survey

10/28/13

The URL below will take you to Mac

http://clasweb.jlab.org/group_meeting_minutes/Physics/talks_2013/mestayer_10_14.pdf