Difference between revisions of "40MeV BeamLineInstall 10252013"
Jump to navigation
Jump to search
Line 36: | Line 36: | ||
| 0 || 5 mil exit window | | 0 || 5 mil exit window | ||
|- | |- | ||
− | | 0 || 338 cube for 6 cross | + | | 0 || 338 cube for 6 cross (2" pipe max diameter) |
|- | |- | ||
| 221|| glass exit window for beam view screen | | 221|| glass exit window for beam view screen |
Revision as of 20:52, 25 October 2013
Beam Line Budget
3 week lead time on flanges
goal will be to run on Dec 2 or Dec 9.
Without 6 cross
Cost ($) | Description |
318 | Bellows |
158 | Hardware (nuts & bolts) |
290 | 5 rotatable flanges |
335 | non-rotatable flanges |
7' + 6' + 3' SS pipe lengths | |
250 | turning pipe on lathe |
2400 | 2 days of labor building beam line components and 1 day installation |
With 6 cross
Cost ($) | Description |
0 | 5 mil exit window |
0 | 338 cube for 6 cross (2" pipe max diameter) |
221 | glass exit window for beam view screen |
232 | 4 rotatable flanges |
268 | 4 non-rotatable flanges |
6 " SS beam pipe | |
800 | 1 day of labor building 6 way cross |