Difference between revisions of "40MeV BeamLineInstall 10252013"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
3 week lead time on flanges | 3 week lead time on flanges | ||
+ | |||
+ | goal will be to run on Dec 2 or Dec 9. | ||
==Without 6 cross== | ==Without 6 cross== |
Revision as of 19:32, 25 October 2013
Beam Line Budget
3 week lead time on flanges
goal will be to run on Dec 2 or Dec 9.
Without 6 cross
Cost ($) | Description |
318 | Bellows |
158 | Hardware (nuts & bolts) |
290 | 5 rotatable flanges |
335 | non-rotatable flanges |
7' + 6' + 3' SS pipe lengths | |
250 | turning pipe on lathe |
2400 | 2 days of labor building beam line and 1 day installation |
With 6 cross
Cost ($) | Description |
0 | 5 mil exit window |
221 | glass exit window for beam view screen |
232 | 4 rotatable flanges |
268 | 4 non-rotatable flanges |
6 " SS beam pipe | |
800 | 1 day of labor building 6 way cross |