Difference between revisions of "40MeV BeamLineInstall 10252013"

From New IAC Wiki
Jump to navigation Jump to search
Line 4: Line 4:
  
 
  3 week lead time on flanges
 
  3 week lead time on flanges
 +
 +
goal will be to run on Dec 2 or Dec 9.
  
 
==Without 6 cross==
 
==Without 6 cross==

Revision as of 19:32, 25 October 2013

Beam Line Budget

3 week lead time on flanges

goal will be to run on Dec 2 or Dec 9.

Without 6 cross

Cost ($) Description
318 Bellows
158 Hardware (nuts & bolts)
290 5 rotatable flanges
335 non-rotatable flanges
7' + 6' + 3' SS pipe lengths
250 turning pipe on lathe
2400 2 days of labor building beam line and 1 day installation

With 6 cross

Cost ($) Description
0 5 mil exit window
221 glass exit window for beam view screen
232 4 rotatable flanges
268 4 non-rotatable flanges
6 " SS beam pipe
800 1 day of labor building 6 way cross


Positrons_Using_40Mev_Linac#10.2F14.2F13