Difference between revisions of "40MeV BeamLineInstall 10252013"

From New IAC Wiki
Jump to navigation Jump to search
Line 6: Line 6:
 
{| border="1"  |cellpadding="20" cellspacing="0  
 
{| border="1"  |cellpadding="20" cellspacing="0  
 
|-
 
|-
|Cost||Description
+
|Cost ($)||Description
 
|-
 
|-
8   || 4.54 +/- 1.05 ||  4.40  +/-  1.03
+
318   || Bellows
 
|-
 
|-
5    || 4.36 +/- 1.11 ||  4.22 +/- 1.08
+
158 || Hardware (nuts & bolts)
 
|-
 
|-
|| 4.12 +/- 1.19 || 4.03 +/- 1.16
+
290  || 5 rotatable flanges
 +
|-
 +
|  335 || non-rotatable flanges
 +
|-
 +
|    || 7' + 6' + 3' SS pipe lengths
 +
|-
 +
|    || turning pipe on lathe
 
|}
 
|}
  

Revision as of 19:20, 25 October 2013

Beam Line Budget

Without 6 cross

Cost ($) Description
318 Bellows
158 Hardware (nuts & bolts)
290 5 rotatable flanges
335 non-rotatable flanges
7' + 6' + 3' SS pipe lengths
turning pipe on lathe

With 6 cross

Energy (MeV) dE/dx for e- (MeV/cm) dE/dx for e+ (MeV/cm)
8 4.54 +/- 1.05 4.40 +/- 1.03
5 4.36 +/- 1.11 4.22 +/- 1.08
3 4.12 +/- 1.19 4.03 +/- 1.16


Positrons_Using_40Mev_Linac#10.2F14.2F13