Difference between revisions of "40MeV BeamLineInstall 10252013"
Jump to navigation
Jump to search
(Created page with " Positrons_Using_40Mev_Linac#10.2F14.2F13") |
|||
| Line 1: | Line 1: | ||
| + | =Beam Line Budget= | ||
| + | ==Without 6cross== | ||
| + | |||
| + | {| border="1" |cellpadding="20" cellspacing="0 | ||
| + | |- | ||
| + | |Cost||Description | ||
| + | |- | ||
| + | | 8 || 4.54 +/- 1.05 || 4.40 +/- 1.03 | ||
| + | |- | ||
| + | | 5 || 4.36 +/- 1.11 || 4.22 +/- 1.08 | ||
| + | |- | ||
| + | | 3 || 4.12 +/- 1.19 || 4.03 +/- 1.16 | ||
| + | |} | ||
| + | |||
| + | == With 6 cross== | ||
| + | |||
| + | {| border="1" |cellpadding="20" cellspacing="0 | ||
| + | |- | ||
| + | |Energy (MeV) || dE/dx for e- (MeV/cm)|| dE/dx for e+ (MeV/cm) | ||
| + | |- | ||
| + | | 8 || 4.54 +/- 1.05 || 4.40 +/- 1.03 | ||
| + | |- | ||
| + | | 5 || 4.36 +/- 1.11 || 4.22 +/- 1.08 | ||
| + | |- | ||
| + | | 3 || 4.12 +/- 1.19 || 4.03 +/- 1.16 | ||
| + | |} | ||
[[Positrons_Using_40Mev_Linac#10.2F14.2F13]] | [[Positrons_Using_40Mev_Linac#10.2F14.2F13]] | ||
Revision as of 16:59, 25 October 2013
Beam Line Budget
Without 6cross
| Cost | Description | |
| 8 | 4.54 +/- 1.05 | 4.40 +/- 1.03 |
| 5 | 4.36 +/- 1.11 | 4.22 +/- 1.08 |
| 3 | 4.12 +/- 1.19 | 4.03 +/- 1.16 |
With 6 cross
| Energy (MeV) | dE/dx for e- (MeV/cm) | dE/dx for e+ (MeV/cm) |
| 8 | 4.54 +/- 1.05 | 4.40 +/- 1.03 |
| 5 | 4.36 +/- 1.11 | 4.22 +/- 1.08 |
| 3 | 4.12 +/- 1.19 | 4.03 +/- 1.16 |