Difference between revisions of "201308 R1ProgressRep"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | = | + | =8/5/13= |
Dion: String S2 with David ; left at 12:30 | Dion: String S2 with David ; left at 12:30 | ||
Line 18: | Line 18: | ||
S3: stringing finished | S3: stringing finished | ||
+ | |||
+ | =8/6/13= | ||
+ | |||
+ | Dion: String S2 with David ; left at 12:30 | ||
+ | |||
+ | David: String S2 with Dion ; left at 12:30 | ||
+ | |||
+ | Debbie: took a position at ON semiconductor | ||
+ | |||
+ | Haitham: HV burn in S5 and test signals, debug TDC DAQ, S6 summary table and pictures, debug high current on S5-SL2-HVB5 | ||
+ | |||
+ | S2 : stringing will finish this week | ||
+ | |||
[[CLAS12_R1_Progress_Reports]] | [[CLAS12_R1_Progress_Reports]] |
Revision as of 16:51, 6 August 2013
8/5/13
Dion: String S2 with David ; left at 12:30
David: String S2 with Dion ; left at 12:30
Debbie: took a position at ON semiconductor
Haitham: HV burn in S5 and test signals, debug TDC DAQ, S6 summary table and pictures, debug high current on S5-SL2-HVB5
S6 Testing and Performance Summary
Carlos: working full time on NSF grant now
S2 : stringing will finish this week
S3: stringing finished
8/6/13
Dion: String S2 with David ; left at 12:30
David: String S2 with Dion ; left at 12:30
Debbie: took a position at ON semiconductor
Haitham: HV burn in S5 and test signals, debug TDC DAQ, S6 summary table and pictures, debug high current on S5-SL2-HVB5
S2 : stringing will finish this week