Pb-Bi liquid target operation | Pb-Bi liquid target operation | ||
1.) pump down chamber | 1.) pump down chamber | ||
+ | |||
2.) backfill with argon to 1atm | 2.) backfill with argon to 1atm | ||
+ | |||
3.) heat top at full power by plugging into wall directly, the other heaters use a rheostat | 3.) heat top at full power by plugging into wall directly, the other heaters use a rheostat | ||
+ | |||
4.) 360 watts applied to mid center until temperature at bottom flange is 120 C | 4.) 360 watts applied to mid center until temperature at bottom flange is 120 C | ||
+ | |||
5.) turn on the other heaters at 20 % of 120 volts until the temperature warms to at least 40 C | 5.) turn on the other heaters at 20 % of 120 volts until the temperature warms to at least 40 C | ||
− | 6.) vent if the pressure | + | |
+ | 6.) vent if the pressure goes above 2 ATM | ||
+ | |||
7.) once loop is about 40 C or more, increase rheostats to 40% of 120 volts | 7.) once loop is about 40 C or more, increase rheostats to 40% of 120 volts | ||
+ | |||
8.) top reservoir will be kept heating at full power until maxing out at 300 C then you can turn it off when bottom well is liquid | 8.) top reservoir will be kept heating at full power until maxing out at 300 C then you can turn it off when bottom well is liquid | ||
+ | |||
9.) at 70 C in the well increase reostat to 60% | 9.) at 70 C in the well increase reostat to 60% | ||
+ | |||
10.) unplugged top heater when it hits 289 C, temp in middle of loop was 280 | 10.) unplugged top heater when it hits 289 C, temp in middle of loop was 280 | ||
+ | |||
11.) when well temp was 170 C , the high power heater (right side) is increased to 100 % while all other heaters are turned off | 11.) when well temp was 170 C , the high power heater (right side) is increased to 100 % while all other heaters are turned off | ||
− | |||
− | + | ||
20 C difference between top center and well right | 20 C difference between top center and well right |
Revision as of 19:33, 25 July 2013
Pb-Bi liquid target operation
1.) pump down chamber
2.) backfill with argon to 1atm
3.) heat top at full power by plugging into wall directly, the other heaters use a rheostat
4.) 360 watts applied to mid center until temperature at bottom flange is 120 C
5.) turn on the other heaters at 20 % of 120 volts until the temperature warms to at least 40 C
6.) vent if the pressure goes above 2 ATM
7.) once loop is about 40 C or more, increase rheostats to 40% of 120 volts
8.) top reservoir will be kept heating at full power until maxing out at 300 C then you can turn it off when bottom well is liquid
9.) at 70 C in the well increase reostat to 60%
10.) unplugged top heater when it hits 289 C, temp in middle of loop was 280
11.) when well temp was 170 C , the high power heater (right side) is increased to 100 % while all other heaters are turned off
20 C difference between top center and well right
4 = top center 3=center left 2 = well right 1=well left
20 mill windows
4mm target window
5 kg of eutectic 45/55 ratio
Heat tape is rated at120 volts at 300 watts