Line 39: Line 39:
 
Carlos: Wire tension measurements & test ADC->TDC channels
 
Carlos: Wire tension measurements & test ADC->TDC channels
  
 +
began at 7:35am
  
 
[[CLAS12_R1_Progress_Reports]]
 
[[CLAS12_R1_Progress_Reports]]

Revision as of 13:40, 8 April 2013

4/1/13

Dion: Will start stringing S3 Field with David at 10 am ,HV test the Cracken

David: String S3 Field with Dion , document pulses from S6 until DIon arrives

Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon

Haitham: String S2 with Debbie

Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels

4/4/13

Dion: stringing S3 Field with David at 10 am ,finished the Cracken cable

David: String S3 Field with Dion , work on ADB crate with Carlos

Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon

Haitham: String S2 with Debbie

Carlos: Wire tension measurements & CHECK ADB Polarity use STB + pulse generator to inject signals and test ADC->TDC channels


Stopped work at 5pm


4/8/13

Dion: stringing S3 Field with David at 10 am ,install & test the Cracken cable

David: String S3 Field with Dion , work on ADB crate with Carlos

Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon

Haitham: String S2 with Debbie

Carlos: Wire tension measurements & test ADC->TDC channels

began at 7:35am