Difference between revisions of "201303 R1ProgressRep"
(→3/5/13) |
|||
Line 42: | Line 42: | ||
Carlo: HV burn in SL2-HVB5 | Carlo: HV burn in SL2-HVB5 | ||
+ | |||
+ | =3/18/13= | ||
+ | |||
+ | Dion: String S3 Field with David | ||
+ | |||
+ | David: Stringing S3 Field | ||
+ | |||
+ | Debbie: String S2 in the morning, Look for signals on STB5 | ||
+ | |||
+ | Haitham: String Field S2 | ||
+ | |||
+ | Carlo: Wire tension measurements & ADB crate checkout | ||
[[CLAS12_R1_Progress_Reports]] | [[CLAS12_R1_Progress_Reports]] |
Revision as of 20:07, 18 March 2013
3/4/13
Dion: String S3 with David
David: Stringing S3 Guard
Debbie: String S2 in the morning, HV burn in S6 in the afternoon
Haitham: String Guard on S2
Carlo: HV burn in & signal search S6
Progress:
A super layer of guard wires has been strung on both S2 & S3.
Should be finished with Guard wires by next week
3/5/13
Dion: String S3 with David
David: Stringing S3 Guard
Debbie: String S2 in the morning, HV burn in S6 SL2-HVB6 in the afternoon
Haitham: String Guard on S2
Carlo: HV burn in SL2-HVB6
3/7/13
Signals observed on all channels of S2 SL2 HVB5.
3/11/13
Dion: String S3 Field with David
David: Stringing S3 Field
Debbie: String S2 in the morning, HV burn in S6 SL2-HVB5 in the afternoon
Haitham: String Field S2
Carlo: HV burn in SL2-HVB5
3/18/13
Dion: String S3 Field with David
David: Stringing S3 Field
Debbie: String S2 in the morning, Look for signals on STB5
Haitham: String Field S2
Carlo: Wire tension measurements & ADB crate checkout