Difference between revisions of "Beam Test Jul 23 2012"

From New IAC Wiki
Jump to navigation Jump to search
Line 7: Line 7:
 
= DAQ runs =
 
= DAQ runs =
  
Detector2 -> Beam Left -> CH6
+
Detector2 -> Beam Left -> CH6. [[IAC_NaI_Detectors#Det2]]
  
Detector3 -> Beam Right -> CH5
+
Detector3 -> Beam Right -> CH5. [[IAC_NaI_Detectors#Det3]]
  
 
  Run#  Reprate T1  T2  Start Time    Stop Time    Int Rate(Events/S)
 
  Run#  Reprate T1  T2  Start Time    Stop Time    Int Rate(Events/S)

Revision as of 16:39, 23 July 2012

Tune and deliver positrons

Tune it to Chad's tune from last run: Beam_Test_Jul_20_2012#Chad.27s_Tune

Positrons observed on the 90 degree scintilator.

DAQ runs

Detector2 -> Beam Left -> CH6. IAC_NaI_Detectors#Det2

Detector3 -> Beam Right -> CH5. IAC_NaI_Detectors#Det3

Run#  Reprate T1  T2   Start Time    Stop Time     Int Rate(Events/S)
3636  8 Hz    in  in   09:49:49      10:03:39      2.4334
3637  8 Hz    in  in   10:04:08      10:20:16      2.1641
3638  8 Hz    in  in   10:24:05      10:27:45    2.51
3638  100 Hz  in  in   10:31:04