Difference between revisions of "Beam Test Jul 23 2012"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | |||
− | |||
− | |||
− | |||
= Tune and deliver positrons = | = Tune and deliver positrons = | ||
Revision as of 16:34, 23 July 2012
Tune and deliver positrons
Tune it to Chad's tune from last run: Beam_Test_Jul_20_2012#Chad.27s_Tune
Positrons observed on the 90 degree scintilator.
DAQ runs
Detector2 -> Beam Left -> CH6
Detector3 -> Beam Right -> CH5
Run# Reprate T1 T2 Start Time Stop Time Int Rate(Events/S) 3636 8 Hz in in 09:49:49 10:03:39 2.4334 3637 8 Hz in in 10:04:08 10:20:16 2.1641 3638 8 Hz in in 10:24:05 10:27:45 2.51