=Run Configuration=
  
  
 +
Positrons may be In May
  
Currently scheduled Injector recovery on October 22
+
The main electron beam current needs to be limited to  10 nA using a beam line cavity.
 
 
Positrons May be November 4 & 5
 
 
 
  
 
Currently max energy is 7.8 MeV.
 
Currently max energy is 7.8 MeV.
 
  
 
Choosing 6.3 MeV incident electron energy because that is the most stable.
 
Choosing 6.3 MeV incident electron energy because that is the most stable.
Line 14: Line 12:
 
<math>\sigma</math> = 0.5 mm on the Tungsten target (T1)
 
<math>\sigma</math> = 0.5 mm on the Tungsten target (T1)
  
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
|Date || Task/Item
 +
|-
 +
|Feb. 2, 2012  ||  Readiness Review
 +
|-
 +
|May , 2012  ||  Readiness Review
 +
|-
 +
|}
  
 +
=Manpower=
  
 
{| border="1"  |cellpadding="20" cellspacing="0  
 
{| border="1"  |cellpadding="20" cellspacing="0  
 
|-
 
|-
|Date || Task/Item
+
|Collaborator || available
 +
|-
 +
|Phil Cole  ||  1 week (not available July 1-July 8)
 +
|-
 +
|Dan Dale  ||  1 week (not available July 1-July 8)
 +
|-
 +
|Tony Forest  ||  2 weeks (not available July 1-July 8)
 +
|-
 +
|Dustin McNulty  ||  1 week
 +
|-
 +
|Sadiq Setiniyaz ||  2+ weeks
 
|-
 
|-
|Jan 22, 2012 ||  Readiness Review
+
|Yujong Kim ||  2 weeks (Available May 1 to June 30 but not available May 20-25)
 
|-
 
|-
 
|}
 
|}
  
 +
 +
[[2012AnnihCountrRateEstimate]]
  
 
[[Positrons]]
 
[[Positrons]]

Latest revision as of 17:56, 16 February 2012

Run Configuration

Positrons may be In May

The main electron beam current needs to be limited to 10 nA using a beam line cavity.

Currently max energy is 7.8 MeV.

Choosing 6.3 MeV incident electron energy because that is the most stable.

[math]\sigma[/math] = 0.5 mm on the Tungsten target (T1)

Date Task/Item
Feb. 2, 2012 Readiness Review
May , 2012 Readiness Review

Manpower

Collaborator available
Phil Cole 1 week (not available July 1-July 8)
Dan Dale 1 week (not available July 1-July 8)
Tony Forest 2 weeks (not available July 1-July 8)
Dustin McNulty 1 week
Sadiq Setiniyaz 2+ weeks
Yujong Kim 2 weeks (Available May 1 to June 30 but not available May 20-25)