Jan 22, 2012  Readiness Review
+
=Run Configuration=
  
  
Currently scheduled Injector recovery on October 22
+
Positrons may be In May
 
 
Positrons May be November 4 & 5
 
  
 +
The main electron beam current needs to be limited to  10 nA using a beam line cavity.
  
 
Currently max energy is 7.8 MeV.
 
Currently max energy is 7.8 MeV.
 
  
 
Choosing 6.3 MeV incident electron energy because that is the most stable.
 
Choosing 6.3 MeV incident electron energy because that is the most stable.
Line 14: Line 12:
 
<math>\sigma</math> = 0.5 mm on the Tungsten target (T1)
 
<math>\sigma</math> = 0.5 mm on the Tungsten target (T1)
  
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
|Date || Task/Item
 +
|-
 +
|Feb. 2, 2012  ||  Readiness Review
 +
|-
 +
|May , 2012  ||  Readiness Review
 +
|-
 +
|}
  
 +
=Manpower=
  
 
{| border="1"  |cellpadding="20" cellspacing="0  
 
{| border="1"  |cellpadding="20" cellspacing="0  
 
|-
 
|-
|June || Racks installed and cables pulled to tunnel
+
|Collaborator || available
 
|-
 
|-
|August 2011 || vacuum pumps ready, Compton Polarimeter Table installed
+
|Phil Cole  || 1 week (not available July 1-July 8)
 
|-
 
|-
|September 2011 || Beam Line installed
+
|Dan Dale  || 1 week (not available July 1-July 8)
 
|-
 
|-
|October 2011 || Finish Work in Injector area for PePPO
+
|Tony Forest  || 2 weeks (not available July 1-July 8)
 
|-
 
|-
|October 17-19, 2011 || Swing shift hot checkout
+
|Dustin McNulty  || 1 week
 
|-
 
|-
|October 29-Nov 1 2011 || Owl shift PePPo tuning (Probably install Annihilation counter here)
+
|Sadiq Setiniyaz || 2+ weeks
 
|-
 
|-
|Nov 11-16 2011 || Day shift PePPo running
+
|Yujong Kim  || 2 weeks (Available May 1 to June 30 but not available May 20-25)
 
|-
 
|-
 
|}
 
|}
  
 +
 +
[[2012AnnihCountrRateEstimate]]
  
 
[[Positrons]]
 
[[Positrons]]

Latest revision as of 17:56, 16 February 2012

Run Configuration

Positrons may be In May

The main electron beam current needs to be limited to 10 nA using a beam line cavity.

Currently max energy is 7.8 MeV.

Choosing 6.3 MeV incident electron energy because that is the most stable.

[math]\sigma[/math] = 0.5 mm on the Tungsten target (T1)

Date Task/Item
Feb. 2, 2012 Readiness Review
May , 2012 Readiness Review

Manpower

Collaborator available
Phil Cole 1 week (not available July 1-July 8)
Dan Dale 1 week (not available July 1-July 8)
Tony Forest 2 weeks (not available July 1-July 8)
Dustin McNulty 1 week
Sadiq Setiniyaz 2+ weeks
Yujong Kim 2 weeks (Available May 1 to June 30 but not available May 20-25)


2012AnnihCountrRateEstimate

Positrons