Difference between revisions of "2012AnnihCountrRateEstimate"

From New IAC Wiki
Jump to navigation Jump to search
Line 2: Line 2:
  
 
==Previous experiment at the IAC==
 
==Previous experiment at the IAC==
 +
 +
| border="3"  cellpadding="20" cellspacing="0"
 +
| [[File:052008PosProdApparatus.png| 200 px]] ||  [[File:052008PosProdSignal.png| 200 px]] | [[File:052008PosProdBackgrd.png| 200 px]]
 +
|-
 +
| If all Homework is complete and Simulation project is turned in on time || (50%) Homework + (50%)(Simulation Project)
 +
|-
 +
| If 1 homework set is incomplete or more than 48 hours late || (60%)Homework + (40%)(Simulation Project)
 +
|-
 +
|Otherwise ||(70%)Homework + (30%)(Simulation Project)
 +
|-
 +
|}
 +
 +
 +
 +
| border="3"  cellpadding="20" cellspacing="0"
 +
| Condition || Grade Calculation
 +
|-
 +
| If all Homework is complete and Simulation project is turned in on time || (50%) Homework + (50%)(Simulation Project)
 +
|-
 +
| If 1 homework set is incomplete or more than 48 hours late || (60%)Homework + (40%)(Simulation Project)
 +
|-
 +
|Otherwise ||(70%)Homework + (30%)(Simulation Project)
 +
|-
 +
|}
  
 
==NaI rate Ratio of positron to electron beam==
 
==NaI rate Ratio of positron to electron beam==

Revision as of 17:13, 19 January 2012

Rate Estimates

Previous experiment at the IAC

| border="3" cellpadding="20" cellspacing="0" | 052008PosProdApparatus.png || 052008PosProdSignal.png | 052008PosProdBackgrd.png |- | If all Homework is complete and Simulation project is turned in on time || (50%) Homework + (50%)(Simulation Project) |- | If 1 homework set is incomplete or more than 48 hours late || (60%)Homework + (40%)(Simulation Project) |- |Otherwise ||(70%)Homework + (30%)(Simulation Project) |- |}


| border="3" cellpadding="20" cellspacing="0" | Condition || Grade Calculation |- | If all Homework is complete and Simulation project is turned in on time || (50%) Homework + (50%)(Simulation Project) |- | If 1 homework set is incomplete or more than 48 hours late || (60%)Homework + (40%)(Simulation Project) |- |Otherwise ||(70%)Homework + (30%)(Simulation Project) |- |}

NaI rate Ratio of positron to electron beam

Assumed Geometry

Assume a 2 mm thick Tungsten target that is 1" square

The target is located at -80 < Z < -80.2 The NaI crystal is 2.32" or 56.49 mm in diameter The NaI crystal is 8" from the target then the opening angle is atan(2.32/8/2) = 8.25 degrees


PePPO_2012Run