Difference between revisions of "PePPO 2012Run"
Jump to navigation
Jump to search
Line 20: | Line 20: | ||
|} | |} | ||
+ | |||
+ | [[2012AnnihCountrRateEstimate]] | ||
[[Positrons]] | [[Positrons]] |
Revision as of 17:04, 19 January 2012
Run Configuration
Positrons may be In May
The main electron beam current needs to be limited to 10 nA using a beam line cavity.
Currently max energy is 7.8 MeV.
Choosing 6.3 MeV incident electron energy because that is the most stable.
= 0.5 mm on the Tungsten target (T1)
Date | Task/Item |
Jan 22, 2012 | Readiness Review |