Difference between revisions of "PePPO 2011Run"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 29: | Line 29: | ||
|October 29-Nov 1 2011 || Owl shift PePPo tuning (Probably install Annihilation counter here) | |October 29-Nov 1 2011 || Owl shift PePPo tuning (Probably install Annihilation counter here) | ||
|- | |- | ||
− | |Nov | + | |Nov 11-16 2011 || Day shift PePPo running |
|- | |- | ||
|} | |} | ||
=Region 3 = | =Region 3 = | ||
− | + | The annihilation counter is labeled as IAC5D03 on the JLAb beam line | |
[[File:09012011_PePPO_R3.png | 400 px]] | [[File:09012011_PePPO_R3.png | 400 px]] |
Latest revision as of 15:30, 2 November 2011
PePPO run
Currently scheduled Injector recovery on October 22
Positrons May be November 4 & 5
Currently max energy is 7.8 MeV.
Choosing 6.3 MeV incident electron energy because that is the most stable.
= 0.5 mm on the Tungsten target (T1)
June | Racks installed and cables pulled to tunnel |
August 2011 | vacuum pumps ready, Compton Polarimeter Table installed |
September 2011 | Beam Line installed |
October 2011 | Finish Work in Injector area for PePPO |
October 17-19, 2011 | Swing shift hot checkout |
October 29-Nov 1 2011 | Owl shift PePPo tuning (Probably install Annihilation counter here) |
Nov 11-16 2011 | Day shift PePPo running |
Region 3
The annihilation counter is labeled as IAC5D03 on the JLAb beam line
Cable length are 75-100 feet long
2 NaI detectors
Instead of using the mirrors described below, the NaI detectors were rotated in Phi to be out of the way of a camera view.
Old mirror design (not implemented)
one has mirror between it and the port window to reflect light to a camera.
See if we can send out one of our actuators to move the mirror in and out.
Aluminum WIndow pressure test
A 5 mil window bursts at 65 PSI
A 10 mil window bursts at 110 PSI
Positrons Go Back