Difference between revisions of "PePPO 2011Run"
Jump to navigation
Jump to search
Line 30: | Line 30: | ||
|- | |- | ||
|October 29-Nov 1 2011 || Owl shift PePPo tuning | |October 29-Nov 1 2011 || Owl shift PePPo tuning | ||
− | ||- | + | | |
+ | |- | ||
|Nov 3-6 2011 || Day shift PePPo running | |Nov 3-6 2011 || Day shift PePPo running | ||
|- | |- |
Revision as of 14:51, 7 September 2011
PePPO run
Currently scheduled Injector recovery on October 22
Positrons May be November 4 & 5
Currently max energy is 7.8 MeV.
Choosing 6.3 MeV incident electron energy because that is the most stable.
= 0.5 mm on the Tungsten target (T1)
June | Racks installed and cables pulled to tunnel | |
August 2011 | vacuum pumps ready, Compton Polarimeter Table installed | |
September 2011 | Beam Line installed | |
October 2011 | Finish Work in Injector area for PePPO | |
October 17-19, 2011 | Swing shift hot checkout | |
October 17-19, 2011 | Swing shift hot checkout | |
October 29-Nov 1 2011 | Owl shift PePPo tuning | |
Nov 3-6 2011 | Day shift PePPo running |
Region 3
Cable length are 75-100 feet long
2 NaI detectors
one has mirror between it and the port window to reflect light to a camera.
See if we can send out one of our actuators to move the mirror in and out.