Line 22: Line 22:
  
 
6.) Floor plan layout for staging materials, assembly, production, testing, packaging, and shipping
 
6.) Floor plan layout for staging materials, assembly, production, testing, packaging, and shipping
 +
 +
Bob Millers Clean room layout
 +
 +
 +
Design Drawings.
 +
 +
 +
 +
Basement Floor Plan for storage
 +
  
 
7.) Directions to the location where we intend to meet with the ISU project manager and his/her team
 
7.) Directions to the location where we intend to meet with the ISU project manager and his/her team

Revision as of 17:25, 12 August 2011

1.) The project managers name and contact info (Phone and e-mail address)

Tony Forest, 208-282-4426, tforest@jlab.org
Dustin McNulty,208-282-4901,mcnudust@isu.edu

2.) A current or updated copy of their QA Plan including any checklists or forms

File:QAPlan.doc

File:QAPlan.pdf

3.) Assembly procedures and non-conformance procedures including interfaces with JLab to resolve problems

4.) Any other current or updated documents needed for reference prior to and during the review

R1 Stringing Manual (Updated by Larry Lim)

https://wiki.iac.isu.edu/index.php/CLAS12_R1_Stringing_Manual

5.) A project org chart

6.) Floor plan layout for staging materials, assembly, production, testing, packaging, and shipping

Bob Millers Clean room layout


Design Drawings.


Basement Floor Plan for storage


7.) Directions to the location where we intend to meet with the ISU project manager and his/her team

8.) Pertinent training records for technicians and staff expected to be working on the project

9.) List of calibrated equipment and records of current calibrations if applicable

10.) Plan of how students will be used, what functions they will perform, and who will be supervising the project/operations


CLAS12_R1#Readiness_Review