Difference between revisions of "PePPO 2011Run"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
− | |||
− | |||
− | August 2011 || vacuum pumps ready, Compton Polarimeter Table installed | + | {| border="1" |cellpadding="20" cellspacing="0 |
+ | |- | ||
+ | |June || Racks installed and cables pulled to tunnel | ||
+ | |- | ||
+ | |August 2011 || vacuum pumps ready, Compton Polarimeter Table installed | ||
+ | |- | ||
+ | |September 2011 || Beam Line installed | ||
+ | |- | ||
+ | |October 2011 || Finish Work in Injector area for PePPO | ||
+ | |- | ||
+ | |} | ||
=Region 3 = | =Region 3 = |
Revision as of 14:19, 28 April 2011
PePPO run
Currently scheduled Injector recovery on October 22
Positrons May be November 4 & 5
Currently max energy is 7.8 MeV.
June | Racks installed and cables pulled to tunnel |
August 2011 | vacuum pumps ready, Compton Polarimeter Table installed |
September 2011 | Beam Line installed |
October 2011 | Finish Work in Injector area for PePPO |
Region 3
Cable length are 75-100 feet long
2 NaI detectors
one has mirror between it and the port window to reflect light to a camera.
See if we can send out one of our actuators to move the mirror in and out.